Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 14 of 47 <br />Conveyor Footers <br />8'X4'X20' <br />Demo. and on-site <br />240.00 <br />LF <br />$12.95 <br />$3,107.76 <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />Primary Conveyor <br />39'X23X47' <br />Bldg. (MN) <br />31,349.00 <br />CF <br />$0.20 <br />$6,395.20 <br />Building <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Primary Building <br />39X23' <br />Demo. and on-site <br />897.00 <br />SF <br />$2.16 <br />$1,935.73 <br />Foundation <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Conveyor Slope <br />2'X5' <br />Demo. and on-site <br />315.00 <br />LF <br />$12.95 <br />$4,078.94 <br />Stabilization Piers <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />ROM Secondary Building <br />16'X20'X47 <br />Bldg. (MN) <br />15,040.00 <br />CF <br />$0.20 <br />$3,068.16 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />ROM Secondary Building <br />16'X20'X1' <br />Demo. and on-site <br />320.00 <br />SF <br />$2.16 <br />$690.56 <br />Foundation <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />ROM Conveyor Footers <br />3'X3'X7' <br />Demo. and on-site <br />7.00 <br />LF <br />$12.95 <br />$90.64 <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />Stoker Truck Loadout <br />2'X10'X10' <br />Demo. and on-site <br />20.00 <br />SF <br />$2.16 <br />$43.16 <br />Conveyor Pad <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Stoker Truck Loadout <br />2'X3'X9' <br />Demo. and on-site <br />9.00 <br />LF <br />$12.95 <br />$116.54 <br />Conveyor Footers <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />Substation Upgrade Fence <br />160 LF <br />Fencing, chain link, <br />160.00 <br />LF <br />$2.60 <br />$416.00 <br />Removal <br />including posts and <br />fabric - to 6 ft. high <br />Substation Upgrade <br />1 TON <br />NON -PCB <br />1.00 <br />EA <br />$2,505.00 <br />$2,505.00 <br />Transformer <br />Transformer <br />Removal <br />Substation Upgrade <br />14'X16'X2' <br />Demo. and on-site <br />448.00 <br />SF <br />$2.16 <br />$966.78 <br />Transformer Pad <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Substation Upgrade <br />15'X30' <br />Demo. and on-site <br />450.00 <br />SF <br />$2.16 <br />$971.10 <br />Building Pad <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Substation Upgrade <br />90 LF <br />Demo. and on-site <br />90.00 <br />LF <br />$4.48 <br />$403.29 <br />Building Footers <br />disposal in <br />excavated pit, 1.0 ft. <br />x 2 ft. - Max. 200 ft. <br />push <br />Substation Upgrade <br />30'X12' (15) <br />Bldg. (MN) <br />5,400.00 <br />CF <br />$0.20 <br />$1,101.60 <br />Building <br />demo./on-site <br />CIRCES Cost Estimating Software <br />