My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-10_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2016-03-10_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:59 PM
Creation date
3/11/2016 7:25:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
3/10/2016
Doc Name
Letter Confirming the Informal Conference date and time
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
SI2
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT <br />Page 13 of 47 <br />Thickener Tank <br />36 LF <br />Demo. and on-site <br />36.00 <br />LF <br />$12.95 <br />$466.16 <br />Foundation <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />Refuse Bin Foundation <br />728 SF <br />Demo. and on-site <br />728.00 <br />SF <br />$2.16 <br />$1,571.02 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Magnetite Bin Foundation <br />14 SF <br />Demo. and on-site <br />14.00 <br />SF <br />$2.16 <br />$30.21 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Magnetite Bin Footer <br />3 LF <br />Demo. and on-site <br />3.00 <br />LF <br />$12.95 <br />$38.85 <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />Prep Plant Building <br />45'X54X76' <br />Bldg. (MN) <br />184,680.00 <br />CF <br />$0.20 <br />$37,674.72 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Thickener Tank <br />962'X18' <br />Bldg. (MN) <br />17,314.00 <br />CF <br />$0.20 <br />$3,532.06 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Refuse Bin <br />20'X54'X78' <br />Bldg. (MN) <br />84,240.00 <br />CF <br />$0.20 <br />$17,184.96 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Train Loadout Stack Tube <br />154'X115' <br />Bldg. (MN) <br />17,699.00 <br />CF <br />$0.20 <br />$3,610.60 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Train Loadout Tunnel <br />330'X10'X13' <br />Bldg. (MN) <br />42,900.00 <br />CF <br />$0.20 <br />$8,751.60 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Motor Control Center <br />20'X20'X10' <br />Bldg. (MN) <br />4,000.00 <br />CF <br />$0.20 <br />$816.00 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Batch Weigh Building <br />28'X40'X111' <br />Bldg. (MN) <br />124,320.00 <br />CF <br />$0.20 <br />$25,361.28 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />MCC Building Foundation <br />20'X20'X1' <br />Demo. and on-site <br />400.00 <br />SF <br />$2.16 <br />$863.20 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Batch Weigh Building <br />16'X4'X6' <br />Demo. and on-site <br />32.00 <br />LF <br />$12.95 <br />$414.37 <br />Foundation <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.