Laserfiche WebLink
February 16, 2016 C-2010-089/New Horizon North Mine BFB <br /> damage and reconfigure the two drainage ditches and how they intersect the Pond 001 east ditch. The <br /> configuration of the Pond 001 east ditch will not change. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> WFC is preparing to install the northern end of Pond 1 East Ditch as specified in the permit. The Pond 1 <br /> ditch will connect with the north ditch of Pond 2 at the top of the hill. Frank Ferris and Trevor Ragsdale explained <br /> that this section of the mine has buried ledge rock which could create unique challenges to the construction of the <br /> ditch. The Division understands that the ditch may not be built to designed specifications due to unknown ground <br /> conditions and will work with WFC to build the ditch. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> PHOTOGRAPHS <br /> 1 � <br /> f <br /> Photo 1 —Bald Eagle Nest North of Mine Pit Photo 2—Pump at the NH I Pond <br /> a <br /> Y 'J <br /> r. d <br /> Photo 3—Pond 001 Photo 4—Pond 001 East Ditch Segment 7 <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 3 <br />