PERMIT #: M-1980-149 <br />INSPECTOR’S INITIALS: PSH <br />INSPECTION DATE: February 12, 2016 <br /> <br /> <br />Page 3 of 8 <br />Phase 4 is located east of Phase 2 and north of Phase 3 in the northeast corner of the site.  The Phase was  <br />recently lined with a slurry wall.  The Operator has not submitted the SEO approval for the slurry wall to the  <br />Division.  The location of the slurry wall centerline was marked on all sides with white posts. The Phase was  <br />actively mining and dewatering.  The mining excavation is progressing from the north to south.  A processing  <br />plant and stockpile storage area was observed in the southern portion of the Phase.   <br />  <br />The parcel east of Phase 3 was mined and reclaimed to developed water resource years ago.  The Operator  <br />has not submitted the SEO approval for the slurry wall to the Division.  The Division will require proof of SEO  <br />approval for the slurry wall prior to consideration of future release requests.  The parcel slopes and vegetation  <br />could not be evaluated due to limited access of the area.  <br />  <br />As cited as problems, the Operator committed to the following items during the amendment No. 3 application  <br />process which have not been completed according to the Division’s files:  <br />  <br />The Operator committed to providing baseline groundwater monitoring plan data to the Division prior to the  <br />installation of the liners (clay and slurry walls).  The Division has not received the baseline data to date.  The  <br />Operator shall provide the baseline groundwater monitoring data for the Division’s file.  <br />  <br />The Operator committed to submit the monthly monitoring data to the Division on a quarterly basis following  <br />the submittal of the initial baseline groundwater data.  The Division has not received the quarterly  <br />groundwater data.  The Operator shall provide all available groundwater monitoring data for the Division’s file  <br />and commit to provide the monthly monitoring data with the annual report starting with the 2017 Annual  <br />Report.  <br />  <br />The Operator committed to install a perimeter drain along the western side of the site, adjacent to the clay  <br />liner in Phase 2.  The Division was not notified the perimeter drain was installed prior to the installation of the  <br />clay liner and has not received as‐built drawings for the installed perimeter drain.  The Operator shall provide  <br />as‐built drawings for the perimeter drain along the western side of Phase 2.   <br />  <br />The Operator committed to install a perimeter drain along the southern edge of the site, along the existing  <br />alignment of Firestone Blvd.  The Division was not notified the perimeter drain was installed prior to the  <br />installation of the clay liner and slurry walls and has not received as‐built drawings for the installed perimeter  <br />drain.  The Operator shall provide as‐built drawings for the perimeter drain along the southern edge of the  <br />site.   <br />  <br />The Operator committed to supply copies of the agreements with the gas line companies for the slurry wall  <br />crossing with the gas lines in the Phases 3 and 4 during construction of the slurry walls.  The Division did not  <br />received copies of the agreements with the gas line companies during the construction of the Phases 3 and 4  <br />slurry walls.  The Operator shall provide copies of the crossing agreements with the gas line companies in  <br />Phases 3 and 4.  <br />  <br />The Division will require the Operator to verify the required 4H:1V slopes of the reservoirs by submitting  <br />survey data verifying the grading prior to Division consideration of any future final or partial release requests  <br />at the site, if the reservoir are filled with water at the time of the release inspection.  <br />  <br />Photographs taken during the inspection are attached.