My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-25_REVISION - M1990140
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990140
>
2016-02-25_REVISION - M1990140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:30 PM
Creation date
3/4/2016 9:02:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990140
IBM Index Class Name
Revision
Doc Date
2/25/2016
Doc Name
Request CN01
From
Martin Pit 1-A
To
DRMS
Type & Sequence
CN1
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> "HELD TO A HIGHER STANDARD" <br /> Exhibit L — Reclamation Costs <br /> Duran & Pearce Contractors (Operator) current Bond amount for the 9.32 Acres permitted <br /> under the 110 Permit is $21,220.00 (direct+ indirect). In converting from the current 110 <br /> Permit to a 112 Permit, Duran & Pearce Contractors (Operator) will complete the mining of the <br /> current 9.32 before opening the next 10 acre operation. Majority of all reclamation for the 110 <br /> Permit will be complete. There will NOT be more than 10 Acres opened and being mined at one <br /> time. Duran & Pearce Contractors (Operator) calculates the reclamation cost based off the Cost <br /> Summary Work/ Reclamation Cost Review: <br /> Based on Reclamation Cost Review: <br /> Site: Martin Pit 1-A Permit Action 2012 March Review Permit#: M1990140 <br /> 01a Remove refuse from site Demolish 8 HR $4,135.89 <br /> 02a Reduce pit walls to 4H:1V Dozer 20.91 HR $4,19.25 <br /> 03a Rip compacted access road/stockpile Ripper 1.01 HR $215.00 <br /> 04a Transport topsoil from stockpile Loader 20.18 HR $2,841.00 <br /> 05a Distribute Topsoil Dozer 5.77 HR $1,153.36 <br /> 06a Revegetate Revege 8 HR $2,700.68 <br /> 07a Mobilize 2.57 $2,648.01 <br /> TOTAL DIRECT COSTS: $17,873.19 <br /> INDIRECT COSTS: $3,346.49 <br /> TOTAL BOND AMOUNT: $21,220.00 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.