Laserfiche WebLink
Task description: <br />Site: Golden Eagle Mine <br />BULLDOZER WORK <br />ade Areas Around Well Sealing <br />Permit Action: 2011 Midterm Review <br />PROJECT IDENTIFICATION <br />Task 4: 002 <br />Date: 4/4/2012 <br />User: JDM <br />State: Colorado <br />County: Las Animas <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D3K LGP - 3P <br />Horsepower: <br />74 <br />Blade Type: <br />Power Angle Tilt <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Page 4 of 22 <br />Permit/Job#: C1981013 <br />Abbreviation: None <br />Filename: C013-002 <br />Total unit Cost/Hour: $79.42 <br />Total Fleet Cost/Hour: $79.42 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Utilization % <br />Ownership Cost/Hour: <br />$13.07 <br />Loose volume: <br />NA <br />Operating Cost/Hour: <br />$27.87 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $79.42 <br />Total Fleet Cost/Hour: $79.42 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />7 <br />Swell factor: <br />1.000 <br />Loose volume: <br />7 LCY <br />Source of estimated <br />volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 169.6 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: 0% <br />Average site altitude: 6,400 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />CIRCES Cost Estimating Software <br />