Laserfiche WebLink
Page 3 of 22 <br />Seal NM22 <br />Portland cement <br />7.625 <br />562.7 <br />89.21 <br />bag <br />$9.74 <br />$868.91 <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />Plug Hole <br />PVC plug - 8 in. <br />8 <br />NA <br />1.00 <br />EA <br />$68.98 <br />$68.98 <br />diameter borehole <br />Cut Casing <br />Exposed casing <br />7.625 <br />NA <br />1.00 <br />LF <br />$5.75 <br />$5.75 <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Hole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.75 <br />$2.75 <br />location/identification <br />marker (EA, material <br />cost only) <br />Seal NM23 <br />Portland cement <br />7.625 <br />1388.91 <br />220.21 <br />bag <br />$9.74 <br />$2,144.85 <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />Plug Hole <br />PVC plug - 8 in. <br />8 <br />NA <br />1.00 <br />EA <br />$68.98 <br />$68.98 <br />diameter borehole <br />Cut Casing <br />Exposed casing <br />7.625 <br />NA <br />1.00 <br />LF <br />$5.75 <br />$5.75 <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Hole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.75 <br />$2.75 <br />location/identification <br />marker (EA, material <br />cost only) <br />Seal LA -218 <br />Portland cement <br />4 <br />510 <br />22.25 <br />bag <br />$9.74 <br />$216.72 <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />Plug Hole <br />PVC plug - 4 in. <br />4 <br />NA <br />1.00 <br />EA <br />$27.85 <br />$27.85 <br />diameter borehole <br />Cut Casing <br />Exposed casing <br />4 <br />NA <br />1.00 <br />LF <br />$5.75 <br />$5.75 <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Hole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.75 <br />$2.75 <br />location/identification <br />marker (EA, material <br />cost only) <br />Drill Rig and <br />SCHRAMM <br />NA <br />NA <br />36.00 <br />EA <br />$239.12 <br />$8,608.32 <br />Labor <br />T450BH <br />Flatbed Truck <br />Flatbed Truck, 4x2, <br />NA <br />NA <br />36.00 <br />EA <br />$56.13 <br />$2,020.68 <br />for Equipment <br />15K GVW <br />Water Truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />36.00 <br />EA <br />$68.18 <br />$2,454.48 <br />Gal. <br />Job Hours: 36.00 Total Cost: $20,524.43 <br />CIRCES Cost Estimating Software <br />