Laserfiche WebLink
Page 11 of 22 <br />Struck Volume: <br />8.00 <br />LCY <br />Heaped Volume: <br />10.00 <br />LCY <br />Average Volume: <br />9.00 <br />LCY <br />Adjusted Volume: <br />10.00 <br />LCY <br />Truck Ownership: <br />Final Truck <br />Volume <br />Based on Number of Loader Passes: 9.90 <br />Loading Tool Capacity <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Bucket Size Class: NA <br />Rated Capacity: <br />3.000 <br />LCY (heaped) <br />Bucket Fill Factor: <br />1.100 <br />Other - rock/dirt mixtures (100-120%) 1.100 <br />Adjusted Capacity: <br />3.300 <br />LCY <br />Job Condition Corrections: <br />Site Altitude (ft.): 7350 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.475 minutes <br />LCY <br />3 passes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.475 minutes <br />LCY <br />3 passes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Dumped by truck 0.02 <br />0.020 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.040 minutes <br />0.435 minutes <br />0.970 minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 0.970 Minutes Adjusted for site altitude: 0.970 Minutes <br />Truck Maneuver and Dump Time: 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />CIRCES Cost Estimating Software <br />