My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-04_REVISION - C1981013
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981013
>
2012-04-04_REVISION - C1981013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:52 PM
Creation date
3/3/2016 11:10:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
4/4/2012
Doc Name
2011 Cost Estimate
Type & Sequence
MT6
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil on NW Vent Fan Area <br />Site: Golden Eagle Mine Permit Action: 2011 Midterm Review <br />PROJECT IDENTIFICATION <br />Task 4: 005 State: Colorado <br />Date: 4/4/2012 County: Las Animas <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 8-10 cy, 6x4 <br />-Loader: CAT 928HZ <br />Page 10 of 22 <br />Permit/Job#: C1981013 <br />Abbreviation: None <br />Filename: C013-005 <br />Shift basis: 1 per day <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />Cat D8T - 8SU <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $328.30 <br />MATERIAL OUANTITIES <br />Initial volume: 694 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />45 <br />NA <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$9.13 <br />$16.58 <br />NA <br />$58.56 <br />NA <br />NA <br />Operating cost/hour: <br />$49.72 <br />$14.52 <br />NA <br />$102.81 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.49 <br />NA <br />$38.49 <br />NA <br />NA <br />Unit Subtotals: <br />$58.85 <br />$69.59 <br />NA <br />$199.86 <br />NA <br />NA <br />Number of Units: <br />1 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: $128.44 <br />Support: $199.86 <br />Maint: $0.00 <br />Total work team cost/hour: $328.30 <br />MATERIAL OUANTITIES <br />Initial volume: 694 <br />CCY Swell factor: 1.215 <br />Loose volume: 843 <br />LCY <br />Source of estimated volume: <br />Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: <br />Cat Handbook <br />Material Purchase Cost: <br />$0.00 <br />Total Cost: <br />$0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 <br />Pounds/LCY <br />Description: Top Soil <br />Rated Payload: 27,280 <br />Pounds <br />Payload Capacity: 17.05 <br />LCY <br />Truck Bed (volume) Basis: <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.