Laserfiche WebLink
• §2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING <br />ACTIVITIES - MINIMUM REQUIREMENTS FOR OPERATION AND <br />RECLAMATION PLANS. <br />2.05.6 Mitigation of Surface Coal Mining Operation Impacts. (cont'd.) <br />(6)(a)(ii)(A) ( Cont'd.) <br />presently not considered aquifers or renewable resource lands. <br />Additional groundwater investigation of Renewable Resource Lands and the other <br />potential colluvial /alluvial deposits were performed during the summer 1985. Shallow <br />monitoring wells were installed employing auger drill methods, 2- to 4 -inch PVC casing, <br />and lithologic sampling. See Map No. 4 -1 for locations of shallow monitoring wells. <br />Although similar in geomorphic characteristics, the presence and nature of groundwater <br />was ascertained in these smaller deposits. During monitoring well installation, the <br />degree of development of aquifer characteristics was determined. Specific areas <br />investigated were lithology, degree of sorting, nature of fluvial influence, field <br />permeability testing, an water quality. <br />No mining is scheduled during this permit term therefore areas of potential <br />• colluvial /alluvial deposits will not be undermined. To date, no impacts to renewable <br />resource lands have been noted as a result of mining beneath such lands. <br />Twenty -six (26) buildings or structures have been identified within the C -81 -038 permit <br />area as depicted on Map 9 -7. The structures are ranch - recreation use oriented and the <br />applicants well field and tank. <br />0 PR -04 -138- 08/10 <br />4 FoRevcD <br />I/IV/I <br />