My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-03_PERMIT FILE - C1981038A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2016-02-03_PERMIT FILE - C1981038A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2016 7:33:57 AM
Creation date
2/29/2016 8:59:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
2/3/2016
Doc Name
page 100 to 164
Section_Exhibit Name
Volume 1 2.05 Operation and Reclamation Plans Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND ACTIVITIES -- <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />2.05.6 Mitigation of Surface Coal Mining Operation Impacts. (Cont'd.) <br />(3) (b) (ii) (Cont'd.) <br />The operator believes that periodic reevaluation of the groundwater monitoring program is <br />necessary and will report to the Division monitoring results and projected changes to the monitoring <br />program in the "Annual Hydrology, Subsidence, and Mine Inflow Report". The "Annual Hydrology, <br />Subsidence, and Mine Inflow Report" will be submitted to the Division by April 30 of each year. <br />Groundwater monitoring specified in Tables 3 and 4B of Volume 4 will continue until cessation of <br />operations and /or approval of the Division. <br />Post Reclamation Monitoring <br />When regrading and backfilling of the east mine site is complete, nine piezometers will be installed <br />in the backfilled wedges to monitor groundwater saturation. The piezometers will be installed where <br />shown on Map 6A -5D. One piezometer will be located in the fill wedge above the crushing and <br />screening level. Two piezometers will be located in the fill wedge above the shop level. One <br />piezometer will be located in the fill wedge above the parking level and two piezometers will be <br />located in the fill wedge above the office level. Three piezometers will be located in the fill wedge <br />above the fan level. The piezometers will be installed throughout the entire thickness of the fill <br />wedges. The piezometers will be monitored quarterly through the first two years following <br />backfilling and annually in June thereafter for the duration of the reclamation liability period or until <br />cessation of monitoring is approved by the Division. If unacceptable saturation occurs within any of <br />the fill wedges, remedial measures would be developed and implemented by the operator. A typical <br />piezometer well completion diagram is presented in Volume 6A, the Phase II Study, Geo -Hyro <br />Consulting, Plate 6. <br />PR -04 -124- 06/10 <br />Ffrzoveb <br />//13// / <br />
The URL can be used to link to this page
Your browser does not support the video tag.