My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-26_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2016-02-26_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:34 PM
Creation date
2/29/2016 8:09:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
2/26/2016
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
2/23/2016
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 23, 2016 C-1996-083/Bowie No. 2 Mine JDM <br />Ditches and culverts were partially covered with snow and were in stable condition throughout the mine site, with <br />no issues noted. <br />During the January 2016 inspection, ditch D -C4 located behind the stockpile conveyor above culvert C -C4 had <br />been covered with plowed snow. The plowed snow has been removed from the ditch to ensure functionality. This <br />maintenance item has been adequately addressed with no additional problems noted. <br />Cleared Ditch D -C4 <br />GENERAL MINE PLAN COMPLIANCE: <br />Small combustion events were observed on both coal stockpiles with Bowie Resources personnel actively <br />addressing during the inspection. No potential for spreading of the small fires was evident during the inspection. <br />PROCESSING WASTE/COAL MINE WASTE PILES — Rule 4.10 and 4.11 Drainage Control; Surface <br />Stabilization; Placement: <br />C-'-], %1P 441 <br />Gob Pile #1 has been inactive. Technical Revision No. 97 was approved and provides a variance from the <br />requirement of Rule 4.10.4(4) for 0.2 acres of Gob Pile #1 where the slope was identified as being greater than 2:1. <br />Gob Pile #1 was partially snow covered. <br />Gob Pile #2 <br />Gob Pile #2 was partially snow covered. No activities were on-going during the inspection due to the weather and <br />wet conditions of the pile. Small temporary 6" diameter pipes were placed at ponding areas in order to drain any <br />ponded water. These temporary pipes are dynamic and not permanent structures to remove ponded water on the <br />pile. <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.