Laserfiche WebLink
PART I <br />Page 8 of 31 <br />Permit No.: C00048988 <br />a. 24 hour documentation requirement: <br />Within 24 hours of discovery of any condition listed in the INSPECTIONS section, the permittee must <br />document the following information: <br />i. Identification of the condition triggering the need for corrective action review; <br />ii. Description of the problem identified; and <br />iii. Date the problem was identified. <br />b. Five (5) day documentation requirement: <br />Within five (5) days of discovery of any condition listed in this section, the permittee must document the <br />following information: <br />i. Summary of corrective action taken or to be taken (or, for triggering events that require Review and <br />Modification and the permittee determines that corrective action is not necessary, the basis for this <br />determination); <br />ii. Notice of whether SWMP modifications are required as a result of this discovery or corrective action; <br />iii. Date corrective action initiated; and <br />iv. Date corrective action completed or expected to be completed. <br />4. Control measure modification <br />Modification of any control measure as part of the corrective action required by the CORRECTIVE ACTIONS section <br />must be performed consistent with the CONTROL MEASURES section of this permit. <br />G. STORMWATER MANAGEMENT PLAN (SWMP) <br />1. General SWMP Requirements <br />The following administrative requirements apply to the SWMP written to address all drainage areas contributing <br />runoff to the outfalls referred to in this Part. The permittee shall modify the existing facility SWMP to comply <br />with the requirements of this permit within 90 days of the permit effective date. <br />a. SWMP requirement: The permittee must develop, implement, and maintain a SWMP. The SWMP shall be <br />prepared in accordance with good engineering, hydrologic and pollution control practices (the SWMP need <br />not be prepared by a registered engineer). The permittee must modify the SWMP to reflect current site <br />conditions. <br />b. Submission: The permittee must submit the SWMP to the Division if requested. <br />c. Signatory Requirements: The permittee must sign the SWMP in accordance with the REPORTING AND <br />RECORDKEEPING section; this requirement applies to the original SWMP prepared for the facility, and each <br />time the permittee modifies a SWMP. <br />d. Permit Retention: The permittee must maintain a copy of this permit with the SWMP. <br />e. SWMP Retention: The permittee must retain a copy of the SWMP at the facility unless another location, <br />specified by the permittee, is approved by the Division. <br />f. Consistency with Other Plans: The permittee may incorporate, by reference, applicable portions of plans <br />prepared for other purposes at their facility. Plans or portions of plans incorporated by reference into a <br />SWMP become enforceable requirements of this permit and must be available along with the SWMP. <br />g. Required SWMP Modifications: <br />i. Division initiated: <br />a) The permittee must modify the SWMP when notified by the Division that it does not meet one or <br />more of the requirements of this permit. Unless otherwise provided by the Division, the permittee <br />