My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-24_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2016-02-24_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:30 PM
Creation date
2/26/2016 1:50:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
2/24/2016
Doc Name
Letter & Application (Emailed)
From
New ElK Coal Company
To
DRMS
Type & Sequence
MR14
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 7 of 31 <br />Permit No.: C00048988 <br />c. Weather information and a description of any discharges occurring at the time of the inspection; <br />d. A statement that, in the judgment of 1) the person conducting the site inspection, and 2) the person <br />described in the REPORTING AND RECORDKEEPING section, the site is either in compliance or out of <br />compliance with the terms and conditions of this permit, with respect to this section; <br />e. A summary report and a schedule of implementation of the corrective actions that the permittee has taken <br />or plans to take if the site inspection indicates that the site is out of compliance; <br />f. Name, title, and signature of the person conducting site inspection; and the following statement: "I certify <br />that this report is true, accurate, and complete, to the best of my knowledge and belief."; <br />g. Certification and signature of the person described in REPORTING AND RECORDKEEPING, or a duly <br />authorized representative of the facility thereof. <br />4. Non -Compliance discovered during inspection <br />Any corrective action required as a result of a facility inspection must be performed consistent with the <br />CORRECTIVE ACTIONS section of this permit, and retained with the SWMP. <br />F. CORRECTIVE ACTIONS <br />1. Conditions that must be Eliminated <br />If any of the following conditions occur within the drainage areas associated with the referenced outfalls at the <br />permitted facility (as identified by the permittee; the Division; or an EPA official, or local, or State entity), the <br />permittee must review and revise the selection, design, installation, and implementation of facility control <br />measures to ensure that the condition is eliminated and will not be repeated in the future: <br />a. an unauthorized release or discharge (e.g., spill, leak, or discharge of non-stormwater not authorized by a <br />CDPS permit) occurs; <br />b. facility control measures are not stringent enough for the discharge to meet applicable water quality <br />standards; <br />c. modifications to the facility control measures are necessary to meet the practice -based effluent limits in <br />this permit; or <br />d. the permittee finds in a facility inspection, that facility control measures are not properly selected, <br />designed, installed, operated or maintained. <br />2. Condition that Requires Review and Modification <br />If the following condition occurs, the permittee must review the selection, design, installation, and <br />implementation of facility control measures to determine the appropriate modifications necessary to attain the <br />effluent limits in this permit: <br />a. construction or a change in design, operation, or maintenance at the facility significantly changes the <br />nature of pollutants discharged in stormwater from the facility, or significantly increases the quantity of <br />pollutants discharged. <br />3. Corrective Action Reports and Deadlines <br />The permittee must document discovery of any condition listed in the INSPECTIONS section above, within 24 hours <br />and 5 days as described below, submit the documentation in an annual report as required in the REPORTING AND <br />RECORDKEEPING section, and retain a copy onsite with the facility SWMP as required in the STORMWATER <br />MANAGEMENT PLAN section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.