My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-18_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-02-18_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:44:01 PM
Creation date
2/26/2016 9:54:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
2/18/2016
Doc Name
Weekly QA Report
From
Newmont
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK &VICTOR GOLD MINE <br /> NEWMONT MINING CO. amec <br /> SQUAW GULCH VLF WEEKLY REPORT foster <br /> wheeler <br /> Soil Liner Fill: <br /> Processing began at Dump 1 location. <br /> Underground Workings: <br /> Blasting: <br /> None. <br /> Confirmatory Drilling: <br /> UG#6477: Sandvik 700—37.0 hours, 40001-F. Further remediation required. <br /> UG#6617: A Cat doxer prepared drill access. Sandvik 700—3.0 hours, 3001-F. Further <br /> remediation required. <br /> Remediation: <br /> UG#6679: A John Deere excavator removed shot rock in preparation for geogrid <br /> subgrade. A John Deere excavator placed structural backfill to geogrid subgrade. A Cat <br /> vibratory roller compacted the fill area. Further remediation required. <br /> UG#6692: A Cat excavator continued excavation of possible shaft/adit. Adit extending <br /> north/south. Southern portion remediated to competent rock. Northern portion <br /> prepared for drill access. Further remediation required. T&M = 17.0 hours. <br /> UG#6691: A Cat excavator began excavation of possible stope. Drill access was <br /> provided. Further remediation required. T&M =6.5 hours. <br /> UG#6531: A Cat dozer placed structural backfill to design subgrade. A Cat vibratory <br /> roller compacted the fill area. Further remediation required. <br /> UG#6693: A Cat excavator excavated 10+/-feet to competent rock. Remediated. <br /> T&M = 1.5 hours. <br /> UG#6484: A Cat excavator excavated 2+/-feet to competent rock. Remediated. <br /> T&M = 0.5 hours. <br /> UG#6485: A Cat excavator excavated 4+/-feet to competent rock. Remediated. <br /> T&M = 1.0 hours. <br /> UG#6486: A Cat excavator excavated 5+/-feet to competent rock. Remediated. <br /> T&M = 1.0 hours. <br /> UG#6455/6456: A Cat excavator and a Cat dozer removed shot rock in preparation for <br /> geogrid subgrade. A Cat dozer placed structural backfill to design subgrade. A Cat <br /> vibratory roller compacted the fill area. Further remediation required. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> Secondary Underdrain: None. <br /> Tertiary Underdrain: None. <br />
The URL can be used to link to this page
Your browser does not support the video tag.