My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-25_GENERAL DOCUMENTS - C1982056
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982056
>
2016-02-25_GENERAL DOCUMENTS - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:30 PM
Creation date
2/26/2016 8:12:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
2/25/2016
Doc Name
Proposed Decision and Findings (PR11)
From
DRMS
To
Twentymile Coal, LLC
Permit Index Doc Type
Findings
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the right of entry and mine this area. At the writing of this document, TC has not been obtained <br />approval of the LBM. <br />Permit Revision No. 11 (PR -11) proposes to development and longwall mine in the Wolf Creek <br />Coal Seam under previously mined areas in the Eastern Mining District and Northern Mining <br />District and will also affect an additional 150 acres not currently mined; specifically in Sections <br />9, 10, 11, 12, 13, 14, 15, 16 and 17 in Township 5 North, Range 86 west. This Permit Revision <br />includes mining of longwall panels 4RT, SRT, 6RT, 7RT, 8RT and 9RT and associated and gate <br />and bleeder roads. A portion of Fish Creek and Foidel Creek is to be undermined. Routt County <br />Road No. 33 is to be undermined. Coal production is not approved to increase beyond the rate of <br />12,000,000 tons per year. <br />Revisions to the Permit <br />Minor Revisions, Technical Revisions, and Bond Release approvals which have been made to <br />the Foidel Creek Mine permit since the last renewal (RN -06) are listed below. <br />Revision <br />Issuance <br />Liability <br />No. <br />Description <br />Date <br />Change <br />MR267 <br />EMD Water Monitoring Wells. <br />10/17/2013 <br />$15,153.00 <br />MR268 <br />Portal Waste Transfer Station <br />10/30/2013 <br />Expansion. <br />None <br />MR271 <br />Borehole Road Modifications. <br />11/22/2013 <br />$1,321.00 <br />MR270 <br />7 -Right Thickener Underflow Borehole <br />12/13/2013 <br />and Pipeline. <br />$8,563.00 <br />MR273 <br />2 Main North Thickener Underflow <br />12/30/2013 <br />Borehole. <br />None <br />MR269 <br />TRO Coal Quality Coreholes. <br />12/30/2013 <br />$25,163.00 <br />MR272 <br />TRO Coal Quality Coreholes 5-10. <br />1/21/2014 <br />$43,882.00 <br />MR274 <br />Employee Coal Loading Area. <br />2/12/2014 <br />$1,142.00 <br />MR275 <br />WCR Coal Coreholes III. <br />2/27/2014 <br />$25,253.00 <br />MR276 <br />WCR Supplemental Coreholes. <br />4/25/2014 <br />$86,629.00 <br />MR277 <br />WCR Supplemental Corehole <br />5/28/2014 <br />Disturbed Area Modification. <br />$54,347.00 <br />MR278 <br />WCR Supplemental Corehole II. <br />6/12/2014 <br />$42,989.00 <br />MR279 <br />Monitoring Well Relocation. <br />8/18/2014 <br />$10,487.27 <br />MR280 <br />WCR Offset Drilling <br />9/2/2014 <br />$194,435.00 <br />MR281 <br />A Relocation and Corehole WCO28. <br />9/8/2014 <br />None <br />MR282 <br />Test Excavation, Initial Support and <br />9/17/2014 <br />Staging. <br />None <br />MR283 <br />5 Main North Cement Borehole <br />10/15/2014 <br />$15,607.00 <br />MR285 <br />Modifications to 5 -Main North Cement <br />12/1/2014 <br />Borehole. <br />None <br />Foidel Creek Mine 17 February 25, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.