Pond A Access Road <br />This road was formerly a portion of Haulroad C utilized by CYCC. As such, TCC contracted with Northwest <br />Colorado Consultants to evaluate the road for its continued use as an access road into Pond A. The evaluation <br />indicated that an additional 4 inches of Class VI base course and 6 inches of pit run gravel should be applied in lifts <br />and compacted as per the requirements of Rule 4.03.2 to make the road suitable for long -term use as an access road. <br />The location of the road is shown on Map 24A. <br />Rock Dust Tank. Scale. and FCM No.1 Access Roads <br />All of these are existing roads and are monitored to determine if additional surfacing material is needed to maintain <br />compliance with the applicable regulations. <br />Batch Weigh/Loadout Building Access Road <br />A new access road for construction and utilization of the Batch Weigh/Loadout building will be established east of <br />the Tipple 2 product pile site and north of the existing overland conveyor (see Map 24). The access road will be <br />designed and constructed in accordance with the design requirements of Rule 4.03.2. The access road will roughly <br />parallel the overland conveyor for a distance of approximately 390 feet east of the existing Tipple 2 loadout <br />stockpile and terminate at a point south of the location of the Batch Weigh/Loadout building. Following <br />construction, sediment control for the new access road area will be provided by the existing rock filters and <br />vegetative filers currently established for the area. <br />Approximately 1,500 cubic yards of excess fill will be generated from the excavation work required to establish the <br />access road. The material generated will be utilized as permanent fill in the relocation of County Road 27, as <br />TR12 -80 2.05 -73.1 11/07/12 <br />