Trapper Mining Inc., TR -115 <br />Page 14 <br />vibration, if large enough, might affect the sandstone upon which the petroglyphs are painted. <br />The Division requested that Trapper submit a technical revision to update the following <br />information: <br />1.) Revise sections 2.9 and 4.1 of the permit to indicate the site is located within the <br />permit boundary. <br />2.) Revise permit section 2.9 to indicate the correct location of the site and to note the <br />error of the location cited in the cultural resource report included in Appendix K for this <br />site. <br />3.) Revise permit section 4.1 to indicate how far the site will be from the projected <br />mining disturbance. <br />4.) Evaluate whether the mining setback from the site is far enough away from blasting, <br />and given the expected sizes of the blasts, that the site won't be affected. Once this is <br />completed, please revise sections 2.9 and 4.1 of the permit to include the results of this <br />evaluation. In accordance with Rule 2.05.6(4), if additional protective measures are <br />found to be necessary, please discuss them in the revised sections. <br />5.) Please update Map M45. <br />Trapper Response: <br />l.) Enclosed pages 2-590 and 4-3a are revised to indicate that site 5MF948 is located <br />inside the permit boundary but outside the proposed mine plan area. <br />2.) Enclosed page 2-590 is revised to indicate that the location for site 5MF948 given in <br />Appendix K, Part VIII is incorrect. The correct coordinates are now given on this <br />page. <br />3.) Page 4-3a is revised with a corrected distance to the site from the closest proposed <br />mining disturbance. <br />4.) Trapper is currently monitoring the site with a seismograph unit and will complete <br />our analysis of the effects of blasting in the spring of 2016 Preliminary findings <br />have shown minimal ground vibration at the site and impacts should be negligible. <br />5.) Map M45 will be forthcoming with a later Technical Revision when the <br />archeological survey for the PR -07 expansion area is submitted. <br />2.05.3 Operation Plan/Permit Area 2.05.3(4) <br />The Division was unable to locate as -built drawings for the ponds listed below. Please <br />indicate where these can be found or provide drawings conforming to the standards in <br />Rules 4.05.6 and 4.05.9 <br />■ East Pyeatt #3 <br />■ Middle Pyeatt #1, #2, #3 <br />■ Ute <br />■ Johnson #6, #7R, #8, #9R, #1011 <br />■ No Name #2, #4, #511 <br />Trapper Response: As -built drawings for East Pyeatt #3 are included in Appendix Q. Originally <br />ponds #1 and #3 were constructed in East Pyeatt as number 1 and 2. Later pond #2 was added <br />between them and they were renumbered #1, #2, and #3. All three ponds have designs within <br />their respective section of Appendix Q. However, a new drawing for these ponds will be <br />