Laserfiche WebLink
Table 10 <br /> Firestone Gravel Resource(DMG Permit No.M-96-052) Person Responsible for this plan: <br /> January 2016 to December 2017 SWSP Accounting Lynn Mayer Shults <br /> (all values in acre-feet,unless otherwise noted) 303.286.2247 <br /> (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) <br /> DEPLETIONS <br /> MINING DEPLETIONS DEWATERING <br /> Aggregate Production Evaporation Concrete Total Depletions 660 gpm <br /> NET <br /> Month Percent of Dust Total DEPLETIONS <br /> Total Excavated Material Material Not Water Exposed Area Net Evap. Subirigation Control Percent of Water Not Not <br /> Excavated Material(tons) Washed(tons) Washed(tons) Consumed (ac) Rate(ft) Credit(ac-ft) Total Evap. Production Production Consumed Lagged Lagged Lagged Lagged <br /> Material cu. ds. <br /> an-16 2.0% 24,000 18,000 6,000 -0.62 16.33 -0.08 -1.32 -0.02 0.0% 0.00 -1.94 -2.06 37.1 -65.7 -30.7 <br /> Feb-16 1.3% 15,600 11,700 3,900 -0.40 16.33 -0.10 -1.67 -0.01 0.0% 0.00 -2.08 -2.01 11.3 -48.1 -38.8 <br /> Mar-16 5.1% 61,200 45,900 15,300 -1.58 16.33 -0.12 -1.97 -0.05 5.5% 0.00 -3.55 -2.25 69.6 -38.5 1 28.8 <br /> Apr-1 6 9.4% 112,800 84,600 28,200 -2.90 16.33 -0.20 0.03 -3.22 -0.09 9.0% 7,650 -1.17 -6.13 .3.24 76.3 -53.7 18.1 <br /> May-16 9.6% 115,200 86,400 28,800 -2.97 16.33 1 -0.28 0.08 3.53 -0.10 1 13.0% 11,050 -1.70 -7.50 -4.83 56.1 -62.1 -12.5 <br /> Jun-16 10.5% 126,000 94,500 31.500 -3.24 16.33 -0.41 0.12 -6.53 -0.11 1 16.5% 14,025 -2.15 -9.78 -6.48 191.1 -79.0 103.3 <br /> J01-16 9.9% 118,800 89,100 29700 -3.06 16.33 -0.46 0.14 -7.37 -0.10 18.0% 15,300 -2.35 -10.43 -8.19 151.8 -126.6 14.5 <br /> Aug-16 10.3% 123,600 92,700 30,900 -3.18 16.33 -0.39 0.12 -6.30 -0.10 15.0% 12,750 -1.96 -9.49 -9.17 153.2 -140.7 1.3 <br /> Se 16 15.7% 188,400 141,300 47,100 -4.85 16.33 -0.27 0.08 -4.25 -0.16 11.0% 9,350 -1.43 -9.10 -9.30 129.8 -143.6 -24.7 <br /> Oct-16 12.2% 146,400 109,800 36,600 -3.77 16.33 -0.15 0.03 -2.43 -0.12 8.0% 6,800 -1.04 -6.20 -8.79 78.0 -129.8 -61.8 <br /> Nov-16 10.6% 127,200 95,400 31,800 -3.28 16.33 -0.09 -1.54 -0.11 4.0% 3,400 -0.52 -4.81 -7.36 54.1 -101.5 -55.3 <br /> Dec-16 3.4% 40,800 30,600 10,200 -1.05 16.33 -0.07 -1.18 -0.03 0.0% 0.00 -2.23 -5.73 60.3 -79.0 -24.4 <br /> TOTAL 2016 100.0% 1,200,000 900,000 300,000 -30.90 -2.63 0.60 7 33 -1.00 100.0% 80,325 -12.33 -73.24 -69.41 1068.7 -1068.1 -82.1 <br /> Jan-17 2.0% 24,000 18,000 6,000 -0.62 16.33 -0.08 -1.32 -0.02 0.0% 0.00 -1.94 -3.98 37.1 -66.0 -32.9 <br /> Feb-17 1.3% 15,600 11,700 3.900 -0.40 16.33 -0.10 -1.67 -0.01 0.0% 0.00 -2.08 -2.97 11.3 -48.2 -39.9 <br /> Mar-17 5.1% 61,200 45,900 15.300 -1.58 16.33 -0.12 -1.97 -0.05 5.5% 4,675 -0.72 -3.55 -2.73 69.6 -38.6 27.6 <br /> Apr-17 9.4% 112,800 84,600 28,200 -2.90 16.33 -0.20 0.03 -3.22 -0.09 9.0% 7,650 -1.17 -6.13 -3.47 76.3 -53.7 17.8 <br /> May-17 9.6% 115,200 86,400 28.800 -2.97 16,33 -0.28 0.08 -4.53 -0.10 13.0% 11,050 -1.70 -7.50 4.95 56.1 -62.1 -12.7 <br /> Jun-17 10.5% 126,000 94.500 31,500 -3.24 16.33 -0.41 0.12 -6.53 -0.11 16.5% 14,025 -2.15 -9.78 -6.53 191.1 -79.0 103.3 <br /> Jul-17 9.9% 118.800 89100 29,700 -3.06 16.33 -0.46 0.14 -7.37 -0.10 18.0% 15,300 -2.35 -10.43 -8.21 151.8 -126.6 14.5 <br /> Aug-17 10.3% 123,600 92,700 30,900 -3.18 16.33 1 -0.39 0.12 -6.30 1 -0.10 15.0% 12,750 -1.96 -9.49 -9.19 153.2 -140.7 1.3 <br /> LDec-17 <br /> e -17 15.7% 188,400 141,300 47,100 -4.85 16.33 -0.27 0.08 -4.25 -0.16 11.0% 9,350 -1.43 -9.10 -9.31 129.8 -143.6 -24.7 <br /> ct-17 12.2% 146,400 109,800 36,600 -3.77 16.33 -0.15 0.03 -2.43 -0.12 8.0% 6,800 -1.04 -6.20 -8.80 78.0 -129.8 -61.8 <br /> ov-17 10.6% 127,200 95,400 31,800 3.28 16.33 0.09 1.54 0.11 4.0% 3,400 0.52 4.81 54.1 101.5 47.9 <br /> 3.4% 40,800 30,600 10,200 1.05 16.33 0.07 1.18 0.03 0.0% 0.00 2.23 60.3 79.0 18.7 <br /> AL 2017 100.13 1,-----0 900,000 300,000 -30.90 -2.63 0.60 -42.33 -1.00 100.0% 85,000 -13.04 -73.24 -60.14 1068.7 -1068.8 -74.2 <br /> Notes: <br /> 1.Percent of excavated material based on historical operations at site.-Accounting values based on measurements of actual tonnage. <br /> 2.Total excavated material of 1200000 tons in 2016 and 1200000 tons in 2017,distributed per(1). <br /> 3.and 4.Projected tons of material washed and not washed based on historical operations at site.Actual recorded values to be used in SW SP accounting. <br /> 5.Equal to 4%of washed material(3)+2%of material not washed(4). <br /> 6.Exposed surface area outside of lined areas. <br /> 7.Net evaporation based on gross evaporation(NOAA NWS-33)less 70%of average precisiteation. <br /> 8.Historical subirrigation credit at site-From previous historical subirrigation credit analysis. Accounting values based on measurements of actual Ice cover. <br /> 9.Equal to(6)-(7)+(8). <br /> 10.1 ac-ft in 2016 and 1 ac-ft in 2017.Distributed based on(1),and included as part of dewatering(16). <br /> 11.Percent of concrete production based on historical operations at Rinn Valley permit area:Accounting values based on measurements of actual production. <br /> 12.Total concrete production of 80325 cubic yards in 2016 and 85000 cubic yards in 2017,distributed per(11).Concrete plant scheduled to move from Rinn Valley permit area on or about 4/1/2016 <br /> 13.Equal to(12)'50 gallons per cubic yard/325851,and included as part of dewatering(16). <br /> 14.Equal to(5)+(9).Dust control(10)and water used for concrete production(13)comes from pumping for dewatering(16).Therefore,the water for dust control and concrete production are removed from the dewatering amount returned to river,as <br /> calculated in the net depletions(18). <br /> 15.Equal to unlagged mining depletions(14),lagged back to St.Vrain Creek using AWAS program with following aquifer parameters:X=2210 ft;W=2262 ft;T=72300 gpd/ft,and S=0.2. <br /> 16.Based on average pumping over last year of 660 gpm recorded at site. <br /> 17.Equal to unlagged dewatering pumping(16),lagged back to St.Vrain Creek using AWAS program with following aquifer parameters:X=2210 ft;W=2262 ft;T=72300 gpd/ft,and S=0.2. <br /> 18.Equal to(15)+(16).(17)+(10)+(13),since dust control and water for concrete production comes from dewatering pumping that does not return to the river. <br /> Negative values(-)represent net depletions to river system.Positive values(+)represent net accretions to river system. <br /> MOaak.f\M+m+wnnkGFve.u\Swsr ax+LLGfrerntRFSumnarvMt6_1ot,SwSP.av+eu <br /> wd.,n.r.Fv.uo.. ivamFs i>>s w,. <br />