Laserfiche WebLink
Table 9 <br /> Rinn Valley Resource(DMG Permit No. M-97-093) Person Responsible for this plan: <br /> January 2016 to December 2017 SWSP Accounting Lynn Mayer Shults <br /> (all values in acre-feet,unless otherwise noted) 303.286.2247 <br /> (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) <br /> DEPLETIONS <br /> MINING DEPLETIONS DEWATERING <br /> Aggregate Production Evaporation Concrete Total Depletions 330 gpm NET <br /> Month Percent of Dust Total DEPLETIONS <br /> Total Excavated Material Material Not Water Exposed Area Net Evap. Total Percent Of Water Not Not <br /> Excavated Control production Lagged Lagged <br /> Material Material(tons) Washed(fora) Washed(tons) Consumed (ac) Rate(ft) Evap. Production cu. ds. Consumed Lagged Lagged <br /> an- 3.7% 20,028 18,026 2,003 -0.56 6.39 -0.08 -0.49 -0.02 0.0% 0.00 -1.05 -1.40 42.2 -42.2 -1.5 <br /> Feb-16 5.0% 27.066 24,359 2.707 -0.76 6.39 -0.09 -0.60 -0.01 0.0% 0.00 -1.36 -1.44 29.2 -34.7 -7.0 <br /> Mar-16 12.7% 68.746 61.872 6,875 -1.92 6.39 -0.12 -0.75 -0.05 5.5% 4,675 -0.72 -2.68 -2.22 41.5 -39.2 -0.6 <br /> Apr-16 9.9% 53,590 48.231 5,359 -1.50 6.39 -0.20 -1.28 1 -0.09 9.0% 0.00 -2.78 -2.53 41.3 -40.8 -2.1 <br /> May-16 9.6% 1 51,966 46,769 5,197 -1.45 6.39 -0.26 -1.65 1 -0.10 13.0% 1 0.00 -3.10 -2.80 50.0 -46.1 1.1 <br /> Jun-16 12.6% 68,205 61,385 6,821 -1.91 6.39 -0.38 -2.45 -0.11 16.5% 0.00 -4.36 -3.66 68.0 -58.6 5.7 <br /> Jul-16 8.4% 45,470 40,923 4,547 -1.27 6.39 -0.44 -2.79 -0.10 18.0% 0.00 4.06 -3.80 48.0 -51.3 -7.2 <br /> Aug-16 8.3% 44,929 40,436 4,493 -1.26 6.39 -0.38 -2.42 -0.10 15.0% 0.00 -3.68 -3.64 45.5 47.1 -5.4 <br /> Se 16 9.3% 0.00 -0.26 -0.16 11.0% 0.00 0.00 -1.46 0.0 -19.7 -21.3 <br /> Oct-16 6.5% 0.00 -0.18 -0.12 8.0% 0.00 0.00 Z. 00 0.0 -9.8 -10.6 <br /> Nov-16 8.8% 0.00 -0.09 -0.11 4.0% 0.00 0.00 -0.48 0.0 -6.7 -7.3 <br /> Dec!6 5.2% 0.00 0.07 -0.03 0.0% 0.00 0.00 -0.33 0.0 -4.7 -5.0 <br /> TOTAL 2016 100.0% 380,000 342,000 38,000 -10.62 -2.56 -12.43 1 -1.00 100.0% 4,675 1 -0.72 1 -23.05 -24.46 365.8 -400.9 -61.3 <br /> Jan-17 3.7% 0.00 -0.08 0.0% 0.00 0.00 -0.23 0.0 -3.3 -3.5 <br /> Feb-17 5.0% 0.00 -0.09 0.0% 0.00 0.00 -0.16 0.0 -2.3 -2.4 <br /> Mar-17 12.7% 0.00 -0.12 5.5% 0.00 0.00 -0.11 0.0 -1.6 -1.7 <br /> Apr-17 9.9% 0.00 -0.20 9.0% 0.00 0.00 -0.08 0.0 -1.1 -1.2 <br /> May-17 9.6% 0.00 -0.26 13.0% 0.00 0.00 -0.06 0.0 -0.8 -0.8 <br /> Jun-17 12.6% 0.00 -0.38 16.5% 0.00 0.00 -0.04 0.0 -0.5 -0.6 <br /> Jul-17 8.4% 0.00 -0.44 18.0% 0.00 0.00 -0.03 0.0 -0.4 -0.4 <br /> Aug-17 8.3% 0.00 -0.38 1 15.0% 1 0.00 0.00 -0.02 0.0 -0.3 -0.3 <br /> Se 17 9.3% 0.00 -0.26 11.0% 0.00 0.00 -0.01 0.0 -0.2 -0.2 <br /> Oct-17 6.5% 0.00 -0.18 8.0% 0.00 0.00 -0.01 0.0 0.1 -0.1 <br /> Nov-17 8.8% 0.00 -0.09 4.0% 0.00 0.00 -0.01 0.0 -0.1 -0.1 <br /> Dec-17 5.2% 0.00 -0.07 0.0% 0.00 0.00 0.00 0.0 -0.1 -0.1 <br /> TOTAL 2017 100.0% 0 0 0 0.00 -2.56 0.00 0.00 100.0% 0 0.00 0.00 -0.76 0.0 -10.7 -11.4 <br /> Notes: <br /> 1.Percent of excavated material based on historical operations at site.-Accounting values based on measurements of actual tonnage. <br /> 2.Total excavated material of 380000 tons in 2016 and 0 tons in 2017,distributed per(1). <br /> 3.and 4.Projected tons of material washed and not washed based on historical operations at site.Actual recorded values to be used in SWSP accounting. <br /> 5.Equal to 4%of washed material(3)+2%of material riot washed(4). <br /> 6.Exposed surface area outside of lined areas. <br /> 7.Net evaporation based on gross evaporation(NOAA NWS-33)less 70%of average precisiteation(see Table 17). <br /> 8.Equal to(6)'(7). Accounting values based on measurements of actual Ice cover. <br /> 9.1 ac-ft in 2016 and 0 ac-ft in 2017.Distributed based on(1).and included as part of dewatering(15). <br /> 10.Percent of concrete production based on historical operations at site:Accounting values based on measurements of actual production. <br /> 11.Total concrete production of 4675 cubic yards in 2016 and 0 cubic yards in 2017,distributed per(10).Concrete plan(scheduled to move to Firestone Resource site on or about 4/1/2016 <br /> 12.Equal to(11)'50 gallons per cubic yard/325851,and included as part of dewatering(15). <br /> 13.Equal to(5)+(8).Dust control(9)and water used for concrete production(12)comes from pumping for dewatering(15).Therefore,the water for dust control and concrete production are removed from the dewatering amount returned to river,as <br /> calculated in the net depletions(17). <br /> 14.Equal to unlagged mining depletions(13),lagged back to St.Wain Creek using AWAS program with following aquifer parameters:X=715 ft;W=4173 ft;T=125000 gpd/ft,and S=0.2. <br /> 15.Based on average pumping over last year of 330 gpm recorded at site. <br /> 16.Equal to unlagged dewatering pumping(15),lagged back to St.Wain Creek using AWAS program with following aquifer parameters:X=715 ft;W=4173 ft;T=125000 gpd/ft,and S=0.2. <br /> 17.Equal to(14)+(15)+(16)+(9)+(12),since dust control and concrete water comes from dewatering pumping that does not return to the river. <br /> Negative values(-)represent net depletions to river system.Positive values(+)represent net accretions to river system. <br /> C:\PanomWner\lGEsemt\SNSP Jon\LGEse,xtPMSumms,y}016]01)SMSYrepuesL <br /> w«4MeL.Mn vWer 11/16A015 11.]S PM <br />