Laserfiche WebLink
recWimed, the reclamation bond should not reflect costs associated with those features. <br />Therefore, the costs associated with this task ($9,117.00) should be excised from the reclamation <br />bond calculation. <br />Task 004: Rill and Gully Maintenance (3 times over 10 -years). This task specifies that the <br />task will take place three times over the ten year extended liability period. As the mine is at year <br />9.5, this task value should be reduced by at least 67%. Additionally, the "materials consistency <br />description" of consolidated stockpile 1.0 is an accurate description of the material used for rill <br />and gully repair. Rills and gullies are repaired using adjacent topsoil material that has a "lighter" <br />consistency than that of consolidate stockpile material. Further the characterization of "weight <br />description" as decomposed rock (50% rock, 50% earth) is flawed and yields a much higher <br />weight, and consequently reduced production, than the correct characterization of loose earth as <br />the material used to repair rills and gullies. <br />Task 005 Mobilization. As a drill rig will not be required for Task 002, all costs associated with <br />transporting the Atlas/Copco DM45 drill rig to the site should be excised from the reclamation <br />bond estimate. <br />If you have any questions regarding the above observations, please contact Ms. Chi Chi Price or <br />me at your convenience. <br />Sincerely, <br />4442;;*"� <br />Michael S. Savage <br />Principal <br />c: Chi Chi Price, Oakridge Energy <br />511'aae <br />