Laserfiche WebLink
11-10-04 12:06PM FROM-DMG GRAND JUNCTION FIELD OFFICE 970 241 1516 T-358 P.001/004 F-188 <br /> RECEIVED V�_ �BOA � <br /> �A <br /> NOY 10 20H <br /> Division of Minerals&Geobgy .� <br /> August 22,. 1996 <br /> TO: MAGGIE VANCLEEF <br /> FROM: PAUL KRABACHER <br /> RE: ;:, SUNBELT MINING/PEACOCK MINE - C81042 <br /> LA PLATA COUNTY <br /> As you are aware, portal reclosure work and road reclamation was performed at the Peacock <br /> Mine site`in Hay Gulch within a maintenance project last June. Since that time during an <br /> inspection by the Coal Program, serious erosion has occurred stemming from one particular <br /> rain event. The previous maintenance work was performed by Alpine Mine Construction <br /> who was selected through competitive bidding procedures. The work performed under the <br /> previous Purchase Order (#PKA 9600036) was completed and closed out. Because <br /> competitive bidding has already been performed for the exact same work that will be needed, <br /> I am reccommending that Alpine Mine Construction be selected and directed to perform this <br /> additional regrading and revegemon work through a new Purchase Order. 'Work will consist <br /> of the same hydraulic excavator with a 25' minimum reach with a 30" minimum bucket as <br /> well as revegetation of regraded areas. Initial estimates would require 10 hours of machine <br /> time av the previously bid price of$100/hour including mob/demob- Revegetation would cost <br /> $k000 for the estimated 1 acre of regraded area using Alpine's bid price of$1,000/acre. <br /> Total-esti#Wed cost for this Purchase Order would be $2,000.00. <br /> i <br />