Laserfiche WebLink
RECLAMATION ATS (revised 8/93) <br />EXHIBIT L <br />Reclamation costs are estimated on having a maximum area of <br />disturbance consisting of no more than 27.51 acres ± needing some <br />form of reclamation at any one time. This includes areas stripped, <br />partially mined and partially reclaimed, lake surface areas do not <br />need reclamation. The table below outlines the baseline data we <br />used to do our bond estimate calculation. The areas in the table <br />are all within the mined area. This exhibit was prepared by Steve <br />O'Brian of Environment, laa at the request of Albert Frei and Sons, <br />Inc. <br />DESCRIPTION <br />AREA NEEDING REVEGETATION <br />LAKE AREA <br />SEEDBED GRADING/SHAPING <br />UNMINED <br />NEEDS RESOILING <br />UN -SHAPED SLOPES <br />SLOPE FILL VOLUME <br />TOTALS <br />27.51 ac. <br />58.74 ac. <br />7.89 ac. <br />22.05 ac. <br />10.00 ac. (DEPTH 5") <br />3,400 LINEAR FEET <br />9.72 CY/LF <br />ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br />1. Revegetation activities and costs <br />(includes grass seed, fertilizer, mulch and general labor costs) <br />2. Re -spreading soil and/or growth media with scraper, haul <br />less than 500 <br />3. Backfilling and shaping slopes using a D-9 dozer, push <br />distance less than 100 ft <br />4. Seedbed grading and shaping 3 hrs/ac @ $80/hr. <br />RECLAMATION COSTS <br />Unit Cost <br />$ 500.00/AC. <br />0.70/YD3 1/ <br />0.60/YD3 2/ <br />240.00/AC. <br />1. Revegetation costs 27.51 ac @ $500.00/acre $ 13,755.00 <br />2. Resoiling, Haul distance - less than 500' <br />6,725 YD3 x 70G/YD3 4,707.50 <br />3. Backfilling and shaping - push less than 100 ft. <br />33,048 YD3 x 60G/YD3 19,828.80 <br />7. Grading and shaping, 7.89 ac. @ $240.00/ac. 1.893.60 <br />Net Total $ 40,184.90 <br />ADMINISTRATIVE FEES @ 19.20% 7.715.50 <br />SUB -TOTAL $ 47,900.40 <br />Approximate cost at 95% $45,505.30 <br />RECOMMEND BOND BE SET AT $ 45,500.00 <br />11 <br />21 <br />Figured using Cat Handbook and rental costs from local sources for 83% efficiency, 641-8 scraper, in the <br />Denver Metro area. <br />Figured using Cat Handbook and rental costs from local sources for 83% efficiency and a D-9 track dozer, in <br />the Denver Metro area. <br />