My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-15_REPORT - M1987049
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1987049
>
2009-10-15_REPORT - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:12 PM
Creation date
2/17/2016 12:16:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REPORT
Doc Date
10/15/2009
Doc Name
Cost Summary Form
From
DRMS
To
Bromley Lakes
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 10/14/2009 <br />User : <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />State : Colorado <br />County :Adams <br />JLE Site : Bromley Lakes <br />Permit/job # :M-1987-049 <br />Abbreviation :none <br />Filename :M049-002 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :AM02, Bond Estimate <br />Task description : Relocate the McCanne Ditch <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />Machine description : Cat 320C <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 7,138 <br />BCY <br />$26.22 <br />Utilization % <br />NA <br />$46.79 <br />100 <br />$38.72 <br />NA <br />$111.73 <br />Swell <br />factor : <br />1.230 <br />Source of estimated volume :AM02, Application Information <br />Loose <br />volume : <br />Horsepower: 138 <br />Weight (MT) : 19 70 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $111.73 <br />8,780 LCY <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : ABOVE AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.23 <br />Bucket Capacity <br />Rated bucket capacity : 1 63 <br />Bucket fill factor : 0.97 <br />Adjusted bucket capacity : 1.59 LCY <br />LCY (heaped) Bucket size class : <br />Sand and gravel (95% - 100%) <br />medium <br />minutes <br />Job Condition Correction Factors <br />Site altitude : 4.980 feet <br />Unadjusted hourly unit production : <br />Adjusted hourly unit production : <br />Adjusted hourly fleet production : <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />1 excavator(s) <br />$0.330 per LCY <br />Altitude adjustment : <br />Job efficiency adjustment : <br />Net job correction : <br />407.50 LCY/hour <br />338.22 LCY/hour <br />338.22 LCY/hour <br />Total job time : <br />Total job cost : <br />1 00 <br />0.83 <br />0.83 <br />25.96 <br />$2,900 <br />Source <br />(Cat HB) <br />(1 shift/day) <br />multiplier <br />hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.