Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 11 of 16 <br />COMPACTION WORK <br />Task description: Compact 15' native material base of reconstructed 2700 Road <br />Site: New Horizon Mine Permit Action: SL17 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 093 <br />Date: 2/8/2016 <br />User: JDM <br />State: Colorado <br />County: Montrose <br />Abbreviation: None <br />Filename: C008-093 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EOUIPMENT COST <br />Basic Machine: CAT 825H Horsepower: <br />Compactor Type: Soil - tamping foot Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />MATERIAL QUANTITIES <br />Loose volume: 58,556 LCY <br />Compacted volume: 43,917 CCY <br />Source of estimated volume: <br />Source of estimated shrinkage factor: <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Sec 2.05.3 <br />Division estimate <br />354 <br />1 per day <br />(CRG) <br />Shrinkage factor: 0.750 <br />Unadjusted hourly production = (W x S x L x CL <br />7.34 <br />feet <br />Utilization % <br />Ownership Cost/Hour: <br />$62.10 <br />NA <br />Operating Cost/Hour: <br />$116.14 <br />100 <br />Operator Cost/Hour: <br />$28.75 <br />NA <br />Total Unit Cost/Hour: <br />$206.99 <br />Total Fleet Cost/Hour: <br />$206.99 <br />MATERIAL QUANTITIES <br />Loose volume: 58,556 LCY <br />Compacted volume: 43,917 CCY <br />Source of estimated volume: <br />Source of estimated shrinkage factor: <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Sec 2.05.3 <br />Division estimate <br />354 <br />1 per day <br />(CRG) <br />Shrinkage factor: 0.750 <br />Unadjusted hourly production = (W x S x L x CL <br />7.34 <br />feet <br />6.50 <br />mph <br />6.00 <br />inches <br />16.3 <br />(5,280ft./12in./27cu.ft.) <br />3 <br />passes <br />1.555.35 <br />CCY/hour <br />Site Altitude: 5,700 feet <br />Source <br />Altitude Adj : 1.00 (CAT HB <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: 1,290.94 CCY/Hour <br />Adjusted Hourly Fleet Production: 1,290.94 CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) Total job time: 34.02 Hours <br />CIRCES Cost Estimating Software <br />