Laserfiche WebLink
Task description: C <br />Site: New Horizon Mine <br />PROJECT IDENTIFICATION <br />Task #: 092 <br />Date: 2/8/2016 <br />User: JDM <br />COMPACTION WORK <br />15' native material in base of reconstructed BB road <br />Permit Action: SL17 <br />State: Colorado <br />County: Montrose <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Permit/Job#: C1981008 <br />Abbreviation: None <br />Filename: C008-092 <br />Basic Machine: CAT 825H <br />feet <br />Horsepower: 354 <br />Compactor Type: Soil - tamping foot <br />6.00 <br />Shift Basis: 1 per day <br />16.3 <br />(5,280ft./12in./27cu.ft.) <br />Data Source: (CRG) <br />Cost Breakdown: <br />1,555.35 <br />CCY/hour <br />Site Altitude: <br />5,700 feet <br />Utilization % <br />Ownership Cost/Hour: <br />$62.10 <br />NA <br />Operating Cost/Hour: <br />$116.14 <br />100 <br />Operator Cost/Hour: <br />$28.75 <br />NA <br />Total Unit Cost/Hour: <br />$206.99 <br />Total Fleet Cost/Hour: <br />$206.99 <br />MATERIAL QUANTITIES <br />Loose volume: 152,889 <br />LCY <br />Shrinkage factor: 0.750 <br />Compacted volume: 114,667 <br />CCY <br />Source of estimated volume: Sec 2.05.3 <br />Source of estimated shrinkage factor: Division estimate <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Unadjusted hourly production = (W x S x L x C) / P <br />7.34 <br />feet <br />6.50 <br />mph <br />6.00 <br />inches <br />16.3 <br />(5,280ft./12in./27cu.ft.) <br />3 <br />passes <br />1,555.35 <br />CCY/hour <br />Site Altitude: <br />5,700 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: 1,290.94 CCY/Hour <br />Adjusted Hourly Fleet Production: 1,290.94 CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) <br />Unit cost: $0.160 per CCY <br />Total job time: <br />88.82 Hours <br />Total job cost: $18,386 <br />