Laserfiche WebLink
Site: <br />BULLDOZER WORK <br />Task description: Remove Coal Material from Disturbed Area <br />Terror Creek Loadout Permit Action: 2016 Midterm Review <br />PROJECT IDENTIFICATION <br />Task #: 01A <br />Date: 2/16/2016 <br />User: JDM <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat 139T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Permit/Job#: C1983059 <br />Abbreviation: None <br />Filename: C059-OIA <br />Total unit Cost/Hour: $249.37 <br />Total Fleet Cost/Hour: $249.37 <br />MATERIAL QUANTITIES <br />Initial Volume: 8,067 <br />Swell factor: 1.185 <br />Loose volume: 9,559 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />200 feet <br />700.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,800 feet <br />1,400 lbs/LCY <br />Weight description: Coal - Bituminous, Washed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$75.12 <br />NA <br />Operating Cost/Hour: <br />$135.36 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: $249.37 <br />Total Fleet Cost/Hour: $249.37 <br />MATERIAL QUANTITIES <br />Initial Volume: 8,067 <br />Swell factor: 1.185 <br />Loose volume: 9,559 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />200 feet <br />700.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,800 feet <br />1,400 lbs/LCY <br />Weight description: Coal - Bituminous, Washed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />CIRCES Cost Estimating Software <br />