15 feet during year 4, and 30 feet during year 5. The drawdown for the coal simulation was 8 feet <br />during year 1, 5.8 feet during year 2, 6 feet during year 3, 7.3 feet during year 4, and 8 feet <br />during year 5. The simulations for New Horizon Mine indicated that the zero impact contour for <br />the overburden and coal after five years of mining is approximately 4,000 feet. Further, the <br />overburden and coal drawdown contours at New Horizon Mine did not intersect any of the <br />model boundaries, therefore, no impact of the San Miguel River from drawdown in the deeper <br />part of the overburden or coal were predicted. However, some of these predictions do not <br />directly correlate with actual observations made at the old Peabody Nucla Mine (New Horizon <br />#1 Area). For instance, draw down observed at ground water monitoring hole GW -N8 (see New <br />horizon #1 area permit) was first detected (November 1980) when the coal face was only about <br />760 ft from the location of GW -N8. Suggesting that at NHN Mine the zero draw down contour <br />is much closer to the pit face than 4000 feet and the cone of depression is much steeper. Further, <br />during the same period another ground water monitoring hole GW -N9 located only about 854 ft <br />north of the final highwall showed no response (and has not to date) to the drainage from the old <br />Peabody highwall. Version v.2.8.2 of MODFIOW was used to make several simulations of the <br />expected cone of depression. These simulations utilized the hydraulic conductivity value (2.1 <br />ft/day) that was measured at GW -N9. The MODFOW runs (Figure 2.05.6(3)-2d and Figure <br />2.05.6(3)-2e) are contained in Appendix 2.05.6(3)-2 and agree well with the interpretation <br />presented on Figure 2.05.6(3)-2c which is also contained in the Appendix 2.05.6(3)-2. Calculated <br />average daily pit inflow for the coal and overburden zones (K value 2. 1, gradient 0.055, pit <br />length 2217 and saturated thickness of 15 ft) is about 3840 cubic ft/day or about 20 gpm in year <br />1 and declining in subsequent years as the bedrock zones dry out as the result of diverting the 2nd <br />Park Lateral water through the HDPE pipeline. As a matter of clarification, the HDPE pipeline <br />will be moved to the approximate location of the 2nd Park Lateral after mining, backfilling and <br />replacement of top soil has progressed far enough north. This is expected to require about 3 to 4 <br />years after mining begins. The HDPE pipeline will be retained to prevent the irrigation water <br />from draining into the very permeable pit backfill. This will also prevent the direct loss of <br />irrigation water along the course of 2nd Park Lateral as occurs now. The HDPE pipeline will <br />allow for sprinkler irrigation which is much more efficient than flood irrigation. WFC will <br />monitor the bedrock zones and pit discharge in order to refine the extent of drawdown. The <br />hydrological monitoring program should provide reasonably accurate measurements of the <br />effects of mining. While there are no known uses for the bedrock zone water, WFC (as described <br />in the water augmentation plan), has a 114 acre foot consumptive use right on the Colorado <br />Cooperative Company ditch which could be used to mitigate any potential impact on surface <br />water right users from pit inflow drawdown. <br />2) Impact on Groundwater Rights. Groundwater rights (water wells) within the immediate <br />region (1 mile radius) around the NHN permit area are listed in Table 2.04.7-4 and shown on <br />Map 2.04.7-8 of Section 2.04.7. In all, 29 ground water rights (wells) have been identified in the <br />Section 2.05.6(3) Page 14 Sept. 2015 (TR -11) <br />