My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-07_PERMIT FILE - C2010089A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2016-01-07_PERMIT FILE - C2010089A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2017 9:56:06 AM
Creation date
2/11/2016 10:27:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
1/7/2016
Doc Name
Protection of Hydrologic Balance
Section_Exhibit Name
Section 2.05.6(3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conclusion DRMS concluded in its Decision and Findings of Compliance Document (1983) for <br />Peabody's New Horizon Mine that no alluvial valley floors exist in either the New Horizon <br />permit area or the potentially affected area (Tuttle Draw) associated with the New Horizon Mine. <br />The tributaries of Tuttle Draw and Coal Creek Canyon are developed on and have incised a dip <br />slope. The water in the drainages runs on top of weathered bedrock strata. The incised channels, <br />with perennial flow, make it infeasible to construct a gravity flow flood irrigation system. WFC <br />therefore concludes that no alluvial valley floors exist along the potentially affected area of <br />Tuttle Draw and Coal Creek Canyon and their tributaries. This conclusion is substantiated by the <br />results of an EPA alluvial valley floor study (EPA 1977) which addresses most coal mining areas <br />of the west and the fact that flood irrigation from drainages is not being practiced. <br />Hydrology Monitoring Plan WFC has developed a baseline hydrological monitoring program <br />for the NHN Permit area with the advice and consent of DRMS. This monitoring program will <br />continue for the foreseeable future and is proposed to be used with possible minor modifications <br />during the mining and reclamation operations. The monitoring program is described in Appendix <br />2.05.6(3)-3 of this section 2.05.6(3). <br />B) PROBABLE HYDROLOGIC CONSEQUENCES <br />Previous mining by WFC at the New Horizon Mine and Peabody's experience while mining at <br />the old Nucla mine have provided the experience upon which the determinations of "Probable <br />Hydrologic Consequences" are founded. This experience is documented in the New Horizon 1 <br />and New Horizon 2 permit documents and the "Annual Hydrology" reports. The knowledge <br />provided by the long term hydrologic monitoring in relation to the earlier baseline data allows <br />more accurate prediction of consequences than would otherwise occur. Peabody Coal Company <br />performed extensive and detailed computer modeling to determine probable hydrologic <br />consequences of mining for the New Horizon Mine. Details of the computer modeling are <br />available in Attachment 2.05.6(3)-2 of New Horizon 2 Mine permit. While some of the old <br />Peabody Nucla Mine monitoring was suspended in 1987, some of the monitoring holes and <br />surface water monitoring sites have been revisited (monitoring resumed in 1St quarter of 2007) as <br />part of the "2 year close out" for the New Horizon 1 permit area. Three "old" ground water <br />monitoring holes of particular interest that have been monitored during 2008 and 2009 include <br />GW -N3, GW -N8, and GW -N9. <br />As indicated on Figure 2.05.6(3)-1, hydraulic flow south of Meehan Draw at the New Horizon <br />North Mine will generally travel from north to south through the boxcut area and into the old <br />backfill south of the Old Peabody Nucla Mine Highwall. During excavation of the initial boxcut, <br />a buffer of unmined coal and overburden was left in place at the location of the old Peabody <br />Highwall (see Map 2.05.4-2). The purpose of this "buckwall" is to maintain a buffer between the <br />mine spoils from previous surface mining activities and the current active mining pit to provide a <br />Section 2.05.6(3) Page 11 Sept. 2015 (TR -11) <br />
The URL can be used to link to this page
Your browser does not support the video tag.