My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-09_PERMIT FILE - M2015028
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015028
>
2016-02-09_PERMIT FILE - M2015028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:09 PM
Creation date
2/11/2016 8:02:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015028
IBM Index Class Name
PERMIT FILE
Doc Date
2/9/2016
Doc Name
Adequacy Response No. 2
From
Teton Drilling
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Seeding Mix as provided by the U.S.D.A. is shown below. <br /> Foothills/Mountain Seeding Mix above 7,000ft. <br /> Drilled 31.02 # PLS <br /> Broadcasted 61.65 # PLS <br /> Species Variety Notes" °Aof'V1 ix Drill PI.S/A( Broad I'LS/A( <br /> Indian Ricegrass Paloma PN( B 10 0.6 I.2 <br /> Big Bluestem Kaw PN WS 10 I.I _? <br /> Little Bluestem Pastura PNCB 10 r 0.4 0.8 <br /> Blue Grama Hachita PN W B 10 0.3 0.6 <br /> Western Wheatgrass Rosana PNCS 10 1 1.6 `ir <br /> 3 2 <br /> Nodding Brome Native PNCS 10 E 0.5jr— I <br /> Mountain Brome Bromar PNCB 10 I L 2 <br /> Mountain Muhl) Native PNCB 10 I 0.1 0 2 <br /> Arizona Fescue Redondo PNCB 101___ 0.3 r 0.5 <br /> Green Needlegrass Lodorm PNCB 10 1 I 2 <br /> 69 137 <br /> • During the reclamation process initial step is topsoil immediately followed by <br /> hydromulching. <br /> • Due to hydromulching there will be no need for mulching or crimping. <br /> • Due to small size of site hand tools including hoe, rake and pick utilized to break up <br /> compacted top soil areas. <br /> • Roads lightly plowed to break up compacted topsoil. <br /> • Some areas may require Jute Net utilized as best practice. Jute Net is estimated at .25 <br /> Acres. <br /> • Road and berms to remain intact and hydromulched as described above. This will act as a <br /> fire break plus allow future access to Clear Creek Fire Department if ever required. There <br /> are several residences about '/2 to 1 mile due East of property and there are no known <br /> firebreaks in the immediate area. <br /> • Berms or Guardrails required under MSHA: 30 CFR 56.9300 and 57.9300 30 CFR <br /> 77.1605(k). (Attached) <br /> • Berms are a minimum of 36 inches or mid axle height of the largest self- propelled mobile <br /> equipment which usually travels the roadway. <br /> • Berms consist of rock, sandy loam and topsoil. <br /> • Technical justification for leaving berms in place: Road and side berms to remain intact <br /> after reclamation for emergency/ fire and safety access. <br /> Teton Drilling Inc. <br /> Dixie Mine-Clear Creek County,CO <br /> Updated Revisions—February 4,2016 <br /> Page 1 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.