My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-09_REPORT - C1981038
>
Day Forward
>
Report
>
Coal
>
C1981038
>
2016-02-09_REPORT - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:01:33 AM
Creation date
2/11/2016 6:59:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
2/9/2016
From
Bowie Resources, LLC
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Reclamation Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2002 Reclamation Activities: <br />For the reporting year 2002, Bowie Resources, Ltd., continued with the reclamation of the <br />Bowie No. 1 West Mine Site. Reclamation consisted of distributing and grading of nearly 49,000 yrd3 <br />of subsoil and topsoil back to its approximate original contour. Two new sedimentation control <br />ponds have been established near the bottom of the reclaimed area. Upon completion of the grading, <br />the entire area was hydro -seeded with the approved permanent seed mix and using cellulose mulch at <br />a rate of 1,500 pounds per acre and a tackifier at 100 pounds per acre. In conjunction with the hydro <br />seeding, a fertilizer was applied at a rate that applied at least 30 pounds per acre of nitrogen and 60 <br />pounds of phosphorus. <br />During this reporting period the ventilation shaft located at the Bowie No. 1 West Mine was <br />re -filled due to settling. Approximately 2,500 yrd3 was placed into the shaft. As required by the Mine <br />Safety and Health Administration, CFR 30 Part 75.1711-1 beginning from the bottom of the coal <br />seam and extending upward for a distance of 150 feet, the shaft was filled with non-combustible <br />material. The remaining portion of the shaft was filled with other available material. <br />Reclamation of the East Mine consisted of completing the demolition of permanent structures <br />located on the Old Fan Level, Office/Bathhouse Level, and crushing and screening level. <br />Zones Description Acrealle Top soiled Revegetated <br />West Mine 13.10 Yes Yes <br />
The URL can be used to link to this page
Your browser does not support the video tag.