My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-09_REPORT - C1981038
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981038
>
2016-02-09_REPORT - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:01:33 AM
Creation date
2/11/2016 6:59:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
2/9/2016
From
Bowie Resources, LLC
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Reclamation Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year '20/ <br />MineC.-fCfi`?')( 0'33 % )c&2& KL r cPc LC_ <br />mine name permit # Permittee <br />Address: I`- ('V <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />Land Status Category <br />Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total' <br />Acres disturbed <br />5 5^ ( <br />5 S^ <br />Acres backfilled and graded <br />Z. <br />10 years or <br />S. 7 Z <br />Acres to soiled <br />, Z <br />year <br />2/-Z7 <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />Parh r:atPnnry hPlow. Do not include acres that have achieved final. Phase III release. <br />"include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mithe total number of acres disturbed %5�5� / <br />ne, and the total number of acres: <br />Phase I released �C'�� 7 Phase II released Phase III released <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 1_ <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 <br />Acreage in active mining areas 3 <br />(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of -hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Last Years <br />Cumulative <br />This Calendar <br />Cumulative <br />10 years or <br />Greater than <br />Total <br />year <br />Total' <br />less <br />10 years' <br />Acres seeded" <br />1692. <br />6�2 <br />102 0 <br />5 5-- o <br />"include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mithe total number of acres disturbed %5�5� / <br />ne, and the total number of acres: <br />Phase I released �C'�� 7 Phase II released Phase III released <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 1_ <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 <br />Acreage in active mining areas 3 <br />(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of -hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />
The URL can be used to link to this page
Your browser does not support the video tag.