My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-04_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2016-02-04_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:05 PM
Creation date
2/5/2016 9:13:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
2/4/2016
Doc Name
Reclamation Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
MT7
Email Name
TNL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MT7 <br />Material consistency: <br />0.900 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />0.903 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction: 0.3513 <br />Adjusted unit 238.88 LCY/hr <br />production: <br />Adjusted fleet 955.52 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.491/LCY <br />Total job time: 60.93 Hours <br />Total job cost: $86,816 <br />(CAT HB)) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 18 of 149 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.