Laserfiche WebLink
Task description: <br />Site: Williams Fork Mines <br />PROJECT IDENTIFICATION <br />Task #: 007 <br />Date: 2/4/2016 <br />User: JLE <br />MT7 <br />BULLDOZER WORK <br />Portal No. 5 Facilities Area <br />Permit Action: MT7 <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Page 17 of 149 <br />Pere- tWob#: C1981044 <br />Abbreviation: None <br />Filename: C1981044-007 <br />Total unit Cost/Hour: $356.22 <br />Total Fleet Cost/Hour: $1,424.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 51,750 <br />Swell factor: 1.125 <br />Loose volume: 58,219 LCY <br />Source of estimated volume: Table 63; Map 26 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />275 feet <br />680.0 LCY/hr <br />Compacted fill or embankment 0.9 <br />5% <br />5,400 feet <br />50 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$131.81 <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$1.92 <br />15 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $356.22 <br />Total Fleet Cost/Hour: $1,424.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 51,750 <br />Swell factor: 1.125 <br />Loose volume: 58,219 LCY <br />Source of estimated volume: Table 63; Map 26 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />275 feet <br />680.0 LCY/hr <br />Compacted fill or embankment 0.9 <br />5% <br />5,400 feet <br />50 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />