Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br /> Annual Reclamation Report for the Year 2015 <br /> Coal Ridge No. 1 Mine C-1984-065 C. B. Minerals Company, LLC <br /> mine name permit# Permittee <br /> Address: 2352 North 7th Street, Unit B, Grand Junction, CO 81501 <br /> This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br /> by the Division. It should include tent, discussion, and maps, at a minimum, in addition to any other <br /> reclamation monitoring data as required by the approved permit. The location of the acreage reported <br /> under each land status category and year of seeding (if applicable)should be clearly and accurately <br /> identified on a map included with the report. <br /> Last Years This Calendar <br /> Land Status Category Cumulative Total Year Cumulative Total ' <br /> Acres disturbed 45.2 + -0- - 45.2 <br /> Acres backfilled and graded 38.4 + 4.4 42.8 <br /> Acres to soiled 38.4 + 4.4 _ 42.8 <br /> Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br /> each category below. Do not include acres that have achieved final, Phase III release. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total less years ' <br /> Acres seeded* 38.4 + 4.4 = 42.8 _ -0- + 38.4 <br /> *include, if necessary, a description of any augmented seeding or cultural practices <br /> For the Entire Life of Mine the total number of acres disturbed 45.2 and the total number of acres: <br /> Phase I released 38.4 Phase II released 38.4 Phase III released -0- <br /> For Mines in Permanent Cessation: <br /> Total acreage in facilities subject to reclamation but yet to be completed -0- <br /> For Government Performance and Results Act <br /> Acreage in long-term mining or reclamation facilities 2 2.4 <br /> Acreage in active mining areas 3 -0- <br /> '(exclude acres where Phase III release has been achieved) <br /> 2 Includes haul and access roads;temporary dams and impoundments;permanent dams and impoundments;diversion and <br /> collector ditches,water and air monitoring sites;topsoil stockpiles;overburden stockpiles;repair,storage and construction areas; <br /> office area,repair shops,and parking;coal stockpiles,loading,and processing areas;railroads;coal conveyors;nonbackflled and <br /> graded areas of refuse piles,coal mine waste impoundments,head-of-hollow fills,and valley fills;ventilation shafts and entryways; <br /> and noncoal waste disposal area(garbage dumps and coal combustion by-products disposal areas). <br /> ' Includes pits,topsoil stripped areas in advance of pits,and spoil not backfilled and graded <br />