Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 80 of 111 <br />Task description: Replace Topsoil from Upslope Area to BA#1 <br />Site: Lorencito Canvon Mine Permit Action: MT4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task #: 031 State: Colorado <br />Date: 1/22/2016 County: Las Animas <br />User: JHB <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi -Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership $81.10 <br />NA <br />Cost/Hour: <br />Operating $143.16 <br />100 <br />Cost/Hour: <br />Ripper op. $8.91 <br />100 <br />Cost/Hour: <br />Operator $38.01 <br />Cost/Hour: <br />NA <br />Total unit $271.17 <br />Cost/Hour: <br />Total Fleet $542.33 <br />Cost/Hour: <br />MATERIAL OUANTITIES <br />Initial 1,080 <br />Volume: <br />Swell factor: 1.250 <br />Loose volume: 1,350 LCY <br />Source of estimated volume: Table 2.05.4-1 f <br />Source of estimated swell Cat Handbook <br />factor: <br />Abbreviation: None <br />Filename: C084-031 <br />CIRCES Cost Estimating Software <br />