Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 79 of 111 <br />Truck Maneuver and Dump 1.10 Minutes Adjusted for site altitude: 1.100 Minutes <br />Time: <br />Truck Travel (Haul &Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />Haul Route: <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br />(Ft) (%) (%) (fpm) Time <br />(min) <br />1 2800.00 -5.00 5.00 0.00 3569 1.108 <br />Haul Time: 1.108 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />minutes <br />Loading Tool unit <br />(Ft) <br />N <br />N (fpm) <br />Time <br />800.36 LCY/Hour <br />Truck Unit Production <br />376.25 <br />min <br />312.29 LCY/Hour <br />Optimal No. of Trucks: <br />1 <br />2800.00 <br />5.00 <br />5.00 <br />10.00 1819 <br />1.621 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 1.621 <br />minutes <br />Total Truck Cycle Time: 6.279 <br />minutes <br />Loading Tool unit <br />Production <br />964.29 <br />LCY/Hour Adjusted for job efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />376.25 <br />LCY/Hour Adjusted for job efficiency: <br />312.29 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 936.87 <br />LCY/Hour <br />Adjusted single truck/loader team production: 800.36 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 800.36 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 1.27 <br />Hours <br />Unit cost: <br />$1.984 <br />/LCY Total job cost: $2,008 <br />CIRCES Cost Estimating Software <br />