Laserfiche WebLink
Demo Worksheet Cont'd <br />Average push distance: 150 feet <br />Unadjusted hourly 910.5 LCY/hr <br />production: <br />Task # TTT <br />Materials consistency Consolidated stockpile 1.0 <br />description: <br />Average push 0% <br />gradient: <br />Average site 7,100 feet <br />altitude: <br />Material weight: 2,550 lbs/LCY <br />Weight description: Earth - Dry pa, <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency: <br />1.000 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.600 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.902 <br />Blade type: <br />1,000 <br />Net correction: <br />0.3369 <br />Adjusted unit 306.75 LCY/hr <br />production: <br />Adjusted fleet 613.5 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.855/LCY <br />Total job time: 1.65 Hours <br />Total job cost: $866 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />1 SHIFT/DAY) <br />(FND-SF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 76 of 111 <br />CIRCES Cost Estimating Software <br />