My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-25_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2016-01-25_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:57 PM
Creation date
1/27/2016 11:12:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
1/25/2016
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Rob Zuber
Type & Sequence
MT4
Email Name
JHB
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 75 of 111 <br />BULLDOZER WORK <br />Task description: Replace Live -Handled Topsoil to E-3 <br />Site: Lorencito Canyon Mine Permit Action: MT4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task #: 029 State: Colorado Abbreviation: None <br />Date: 1/22/2016 County: Las Animas Filename: C084-029 <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi -Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership <br />Cost/Hour: <br />Operating <br />Cost/Hour: <br />Ripper op. <br />Cost/Hour: <br />Operator <br />Cost/Hour: <br />Total unit <br />Cost/Hour: <br />Total Fleet <br />Cost/Hour: <br />$262.26 <br />$524.52 <br />MATERIAL OUANTITIES <br />Utilization % <br />$81.10 NA <br />$143.16 100 <br />$0.00 0 <br />$38.01 NA <br />Initial 900 <br />Volume: <br />Swell factor: 1.125 <br />Loose volume: 1,013 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.