Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 75 of 111 <br />BULLDOZER WORK <br />Task description: Replace Live -Handled Topsoil to E-3 <br />Site: Lorencito Canyon Mine Permit Action: MT4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task #: 029 State: Colorado Abbreviation: None <br />Date: 1/22/2016 County: Las Animas Filename: C084-029 <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi -Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership <br />Cost/Hour: <br />Operating <br />Cost/Hour: <br />Ripper op. <br />Cost/Hour: <br />Operator <br />Cost/Hour: <br />Total unit <br />Cost/Hour: <br />Total Fleet <br />Cost/Hour: <br />$262.26 <br />$524.52 <br />MATERIAL OUANTITIES <br />Utilization % <br />$81.10 NA <br />$143.16 100 <br />$0.00 0 <br />$38.01 NA <br />Initial 900 <br />Volume: <br />Swell factor: 1.125 <br />Loose volume: 1,013 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />