Laserfiche WebLink
SUBSIDENCE MONITORING PLAN - UNION PACIFIC'S ENERGY SPUR <br />WOLF CREEK SEAM — LONGWALL PANELS 9 EAST THROUGH 3 EAST <br />MAY 1, 2015 <br />s TC will provide mobile equipment, if required, to assist in the handling of the ballast <br />and any fill <br />The above plans will be followed for each of the panels mined by TC. The plan should be <br />considered dynamic and may change as the subsidence data is analyzed, especially in relation to <br />surveying timing and frequency. Any changes will be agreed upon by TC and the UP before <br />implementation of same. <br />DEC -1782031-3 <br />