My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-20_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2016-01-20_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:45 PM
Creation date
1/25/2016 10:50:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
1/20/2016
Doc Name
Reclamation Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
SL8
Email Name
TNL
DIH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Bed (volume) Basis: <br />Struck Volume: <br />12.00 <br />LCY <br />Heaped Volume: <br />18.00 <br />LCY <br />Average Volume: <br />15.00 <br />LCY <br />Adjusted Volume: <br />14.79 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 14.20 LCY <br />Loading Tool Capacity <br />Bucket Size Class: Large <br />Rated Ca acity• 2080 LCY(he a ed <br />P <br />Bucket Fill Factor: 0.975 <br />Loose material - mixed moist aggregates 95-100 <br />Adjusted Capacity: 2.028 <br />LCY <br />Job Condition Corrections: <br />Site Altitude (ft.): 4000 feet <br />Truck <br />Loader Source <br />Altitude Ad': 1.000 <br />1.000 CAT HB <br />Job Efficiency: 0.830 <br />0.830 CAT HB <br />Net Correction: 0.830 <br />0.830 <br />Loading Tool Cycle Time: <br />Number of Loading Tool Passes Required to Fill <br />Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: ABOVE AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA <br />Maneuver: NA Dump: 0.101 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, <br />maneuver): <br />Cycle Time Factors <br />Factor (min.) <br />Material: NA <br />NA <br />Stockpile: NA <br />NA <br />Truck Ownership: NA <br />NA <br />Operation: NA <br />NA <br />Dump Target: NA <br />NA <br />Net Cycle Time Adjustment: NA <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />Truck Cvcle Time: <br />0.234 <br />1.504 <br />0.975 <br />NA <br />7 passes <br />minutes <br />auuiGG <br />'Cat HR <br />'Cat HB' <br />'Cat HB' <br />'Cat HB' <br />'Cat HB' <br />mmutes <br />minutes <br />minutes <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 1.504 Minutes Adjusted for site altitude: 1.504 Minutes <br />Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br />Time: <br />Truck Travel (Haul & Return) Time: Road Condition: Firms smooth, rolline, dirt/lt. surfaced, watered <br />maintained 3.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.