My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-20_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2016-01-20_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:45 PM
Creation date
1/25/2016 10:50:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
1/20/2016
Doc Name
Reclamation Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
SL8
Email Name
TNL
DIH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Clean sediment from Pond 2, dispose in B -Pit <br />Site: Keenesburg Strip Mine Permit Action: SL -08 Permit/Job#: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: I01 State: Colorado <br />Date: 1/20/2016 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: I Generic 12-18 c , 6x4 <br />-Loader: I Cat 320D LRR 9'-6" Stick <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cast Rreakdown: Truck/i,nader Team <br />Abbreviation: None <br />Filename: C81 -I01 <br />Shift basis: 1 per day <br />NA <br />NA <br />CAT 14M <br />Water Tanker, 3,500 Gal. <br />Sunnort F,auinment <br />Maintenance F.auinment <br />Total work team cost/hour: $569.99 <br />MATERIAL OUANTITIES <br />Initial volume: 486 CCY Swell factor: 1.000 <br />Loose volume: 486 LCY <br />Source of estimated volume: Coors Site Plan; assume 4" deep sediment <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Excavator Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 100 NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$15.21 $26.63 NA <br />NA <br />$42.03 <br />$10.57 <br />Operating cost/hour: <br />$66.27 $49.11 NA <br />NA <br />$17.44 <br />$9.05 <br />Ripper op. cost/hour: <br />NA $0.00 NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.22 $38.83 NA <br />NA <br />$38.23 <br />$0.00 <br />Unit Subtotals: <br />$112.70 $114.57 NA <br />NA <br />$97.69 <br />$19.63 <br />Number of Units: <br />3 1 0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: $452.67 Support: $0.00 <br />Maint: $117.32 <br />Total work team cost/hour: $569.99 <br />MATERIAL OUANTITIES <br />Initial volume: 486 CCY Swell factor: 1.000 <br />Loose volume: 486 LCY <br />Source of estimated volume: Coors Site Plan; assume 4" deep sediment <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload(weig_ht) Basis: <br />Material weight: <br />3,400 Pounds/LCY <br />Description: <br />Sand and gravel - Wet <br />Rated Payload: <br />50,300 Pounds <br />Payload Capacity: <br />14.79 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.