My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-20_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2016-01-20_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:45 PM
Creation date
1/25/2016 10:50:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
1/20/2016
Doc Name
Reclamation Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
SL8
Email Name
TNL
DIH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Topsoil Long Term Spoil Area and Parcel 25 <br />Site: Keenesburg Strip Mine Permit Action: SL -08 Permit/Job#: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: E02 State: Colorado Abbreviation: None <br />Date: 1/20/2016 County: Weld Filename: C81 -E02 <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br />C mt Rreakdnwn: Scraner Work Team <br />Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $2,305.72 <br />MATERIAL OUANTITIES <br />Initial volume: 123,965 CCY Swell factor: 1.060 <br />Loose volume: 131,403 LCY <br />Source of estimated volume: Est. area of LTSP and Parcel 25 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />100 <br />100 <br />100 <br />100 <br />Ownership cost/hour: <br />$110.90 <br />NA <br />$72.57 <br />$81.10 <br />$42.03 <br />$10.57 <br />Operating cost/hour: <br />$241.86 <br />NA <br />$142.41 <br />$142.41 <br />$69.74 <br />$36.22 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$39.02 <br />NA <br />$38.85 <br />$38.85 <br />$38.23 <br />$25.61 <br />Unit Subtotals: <br />$391.78 <br />NA <br />$253.83 <br />$262.36 <br />$150.00 <br />$72.41 <br />Number of Units: <br />4 <br />0 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,567.12 <br />Support: <br />$516.19 <br />Maint: <br />$222.41 <br />Total work team cost/hour: $2,305.72 <br />MATERIAL OUANTITIES <br />Initial volume: 123,965 CCY Swell factor: 1.060 <br />Loose volume: 131,403 LCY <br />Source of estimated volume: Est. area of LTSP and Parcel 25 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,850 lbs/LCY <br />Material description: <br />Sand - Damp <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />28.63 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 28.63 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.