Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': 1.000 <br />NA <br />CAT HB <br />Job Efficiency: 0.830 <br />NA <br />CAT HB <br />Site Altitude: 4000 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />u",1 P—+. - <br />Seg # Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity Travel Time <br />00m) (min) <br />1 1600.00 <br />2.75 <br />3.00 <br />5.75 <br />1477 1.16 <br />Haul Time: 1.16 minutes <br />Rafiirn Rnnta• <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />% <br />Total Res <br />% <br />Velocity <br />f m <br />Travel Time <br />(min) <br />1 <br />1600.00 <br />-2.75 <br />3.00 <br />0.25 <br />2965 <br />0.65 <br />Return Time: <br />0.65 <br />minutes <br />Total Scraper team cycle time: <br />3.41 <br />minutes <br />Adjusted for job conditions: <br />836.28 <br />LCY/Hour <br />Selected Number of Scrapers: <br />4 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,672.55 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,672.55 <br />LCY/Hour <br />Unadjusted unit production/hour: 1,007.56 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time <br />109.36 Hours <br />Unit cost: $1.326 /LCY Total job cost: $242,536 <br />