Laserfiche WebLink
Loloff AM‐01 Approval Letter <br />Page 2 of 2 <br />January 21, 2016 <br /> <br />TR‐01 ‐ Stipulation No. 2  <br />Loloff Construction, Inc. will purchase and decree to the Office of State Engineer (SEO)  <br />adequate water rights to cover the remaining 15.3 acres of exposed water in Phase 3 within  <br />1 year from the approval date of TR‐01 or post an additional financial warranty in the  <br />amount of $422,018.00 to cover the costs associated with installing a slurry wall for Phase  <br />3.  <br />  <br />If you have any questions, please contact me at (303) 866‐3567 Ext. 8124.  <br />  <br />Sincerely,  <br />  <br />  <br />  <br />Peter S. Hays  <br />Environmental Protection Specialist  <br />  <br />Certified Mail Return Receipt ‐ 7014 0150 0000 9138 9141  <br />  <br />Cc: Wally Erickson, DRMS  <br /> Barbara Coria, DRMS  <br /> John Vasquez, Loloff Construction  <br /> J.C. York, J&T Consulting, Inc.  <br />  <br />  <br />  <br />