Laserfiche WebLink
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor | Mike King, Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br />  <br />  <br />  <br />  <br />  <br />January 21, 2016  <br />  <br />Mr. Randy Geist  <br />Loloff Construction, Inc.   <br />801 8th Street, Suite 130  <br />Greeley, CO  80631  <br />  <br />Re: Loloff Construction, Inc., Loloff Mine, Permit No. M‐1985‐112, Amendment Approval,   <br /> Revision No. AM‐01  <br />  <br />Mr. Geist:  <br />  <br />On January 21, 2016 the Division of Reclamation, Mining and Safety (Division/DRMS) approved the  <br />Amendment application submitted to the Division on January 12, 2015, addressing the following:  <br />  <br />Amendment to change the post‐mining land use to Developed Water Storage (Slurry Wall)  <br />and increase the affected area to 46.94 acres (4.24 acre increase).  <br />  <br />The terms of the Amendment No. 1 approved by the Division are hereby incorporated into Permit  <br />No. M‐1985‐112.  All other conditions and requirements of Permit No. M‐1985‐112 remain in full  <br />force and effect.  <br />  <br />The revised financial warranty amount of $1,104,455.00 exceeds the $689,552.00 financial  <br />warranty currently held by the Division.  Please submit a rider or a new financial warranty per  <br />Rule 4.2 in the amount of $414,903.00 within 60‐days (March 21, 2016) from the date of this  <br />letter.  The amendment will not be final until the financial warranty increase is approved by the  <br />Division.    <br />  <br />The following stipulations incorporated into the permit with the approval of TR‐01 will be  <br />terminated with the final approval of the amendment application.     <br />  <br />TR‐01 ‐ Stipulation No. 1  <br />Loloff Construction, Inc. will purchase and decree to the Office of State Engineer (SEO)  <br />adequate water rights to cover the remaining 15.4 acres of exposed water in Phase 2 within  <br />120 days from the approval date of TR‐01.  The 15.4 acres of exposed water surface in  <br />Phase 2 will require an additional 45 acre‐ft (2.92 acre‐ft per acre of exposed water  <br />surface).