Laserfiche WebLink
Exhibit D <br />MINING PLAN <br />6.4.4 (a) We will begin by removing topsoil and placing it on <br />the inside of the boundary. Soil will be moved with a <br />scraper and bulldozer. Soil will be held 25 ft. inside the <br />boundary to leave an area for inspection and <br />maintenance. <br />(b) Any remaining overburden will be removed by scraper and <br />bulldozer and placed along the side of our working area. <br />Inside of top soil pile to help with reclamation process. <br />(c) Topsoil and overburden will be placed to build a dike <br />around the active mining area. This will create a <br />diversion to stop storm water from entering the active <br />Mining area. <br />(d) We will open and excavate in several stages. This will help <br />to lessen the impact on the pasture area and help to lessen <br />the cost to reclamation. The pit will be reclaimed as we go. <br />