Laserfiche WebLink
Continued... <br />Page 2 of 2 <br />Conclusions: <br />The average density was slightly higher for the excavator mounted slope packer. The down <br />pressure will vary slightly on sloped ground, but should be minimal. Amec Foster Wheeler will <br />continue to observe and document placement of structural fill material. <br />Based on the above field testing results, it is Amec Foster Wheeler’s opinion that using the <br />Slope Packer equipment to achieve compaction of the material is acceptable. <br />Please do not hesitate to contact me at 303-975-2192 or Andrea.Meduna@amecfw.com with <br />any questions. <br />Sincerely, <br />Amec Foster Wheeler Environment & Infrastructure, Inc. <br /> <br /> <br /> <br />Andrea L. Meduna, PE <br />Project Manager <br /> <br />Ecc: Ms. Katie Holybee, Document Control, CC&V <br /> Ms. Meghan Duck, Document Control, CC&V <br /> Mr. Ron Roberts, Construction Manager, CC&V <br /> Mr. Ron DiDonato, Project Superintendent, CC&V <br /> Mr. Jeff Gaul, Project Superintendent, CC&V <br /> Mr. Robert Redd, Project Resident, Amec Foster Wheeler <br /> <br /> <br />Attached: Thompson Slope Packer <br /> <br /> <br />