Laserfiche WebLink
<br />Section 01400.2 Page 1 of 11 January 14, 2011 <br />Geosynthetic CQA Plan Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\01400.2.r0.doc <br />SECTION 01400.2 GEOSYNTHETIC CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN <br />PART 1: INTRODUCTION <br /> This plan addresses the construction quality assurance (CQA) procedures for the installation of the <br />geosynthetic components used for the construction of the valley leach facility at the Cresson Project, Teller <br />County, Colorado. This program has been developed to assure that the construction of the geosynthetic <br />components are in compliance with the project SPECIFICATIONS and to demonstrate that the regulatory <br />requirements for the construction are achieved. <br /> The objective of this plan is to assure that proper materials, construction techniques, and procedures are <br />followed by the CONTRACTOR and that the intent of the design is met. This program also intends to <br />identify problems that may occur during construction and provide the means for resolution of these <br />problems. <br /> This program addresses quality assurance, not quality control. This CQA Plan is independent of the <br />quality control (QC) programs conducted by the MANUFACTURERS, INSTALLERs, and <br />CONTRACTORS. The intent of the CQA Plan is to provide independent third party verification and <br />testing, to demonstrate that the INSTALLER and CONTRACTORS have met their obligations in the <br />supply and installation of geosynthetic materials according to the design, project SPECIFICATIONS, <br />contractual and regulatory requirements. Quality control is provided by the MANUFACTURERS, <br />INSTALLERS, and CONTRACTORS and refers to those actions taken by them to ensure that their <br />materials and workmanship meet the requirements of the plans and project SPECIFICATIONS. <br />PART 2.0 DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE <br /> The following section provides descriptions of the parties to this CQA plan including their responsibilities <br />and qualifications. <br />2.01 CC&V: <br /> In this CQA Plan CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V <br />owns and operates the valley leach facility. <br />2.02 MANAGER: <br /> In this CQA Plan the MANAGER refers specifically to the individual appointed by the Cripple Creek & <br />Victor Gold Mining Company. The MANAGER is the official representative of CC&V responsible for <br />all construction activities including oversight and direction during construction. The MANAGER is also <br />responsible for coordinating construction and CQA activities for the project. <br /> The MANAGER shall serve as communications coordinator for the project initiating preconstruction and <br />resolution meetings. As communications coordinator, the MANAGER shall serve as a liaison between all <br />parties involved in the project to ensure that ongoing communications are maintained. The MANAGER <br />and CERTIFYING ENGINEER shall also be responsible for the resolution of all CQA issues that arise <br />during the installation of the geosynthetics. <br /> Duties for this position include the following: <br /> review and approval of design DRAWINGS and project SPECIFICATIONS for all <br />geosynthetic components of the valley leach facility;