Laserfiche WebLink
<br /> <br />Section 01400.1 Page 10 of 10 January 14, 2011 <br />Earthworks CQA Plan Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\01400.1.r0.doc <br /> <br /> TABLE 2 <br /> SOIL CONSTRUCTION TESTING FREQUENCY <br /> VOLUME PER TEST1 <br /> <br />Test and <br />ASTM <br />Designation <br />Low Volume Solution Collection Fill, Bedding Fill, <br />Leak Detection Fill, <br />and Pipe Bedding Fill <br />(cy) <br />Soil <br />Liner <br />Fill <br />(cy) <br />Drain <br />Cover <br />Fill <br />(cy) <br />Compaction <br />(ASTM D698) <br />-- 4,000 -- <br />Particle Size2 <br />(ASTM C117, C136, <br />D1140) <br />10,000 4,000 20,000 <br />Atterberg Limit <br />(ASTM D4318) <br /> <br />10,000 4,000 20,000 <br />Moisture Content3 <br />(ASTM D2216) <br /> <br />10,000 500 20,000 <br />Permeability4 <br />(ASTM D5084/2434) <br />-- 4,000 -- <br />Nuclear Density -- 500 -- <br /> <br />1. Tests shall be performed at the specified frequency or one per material type, whichever is greater. <br /> <br />2. Use the USCS for description and identification (ASTM D2488). <br /> <br />3. In-place Moisture Content. <br /> <br />4. Permeability testing will be performed during the processing of the Soil Liner Fill material, certifying the <br />processed stockpile. <br /> <br /> *** END OF SECTION ***